Parviz Fattahi   (ORCID: 0000-0003-3039-2220)
Parviz Fattahi (ORCID: 0000-0003-3039-2220)
Professor, Department of Industrial Engineering, Alzahra University
Verified email at alzahra.ac.ir
Title
Cited by
Cited by
Year
Mathematical modeling and heuristic approaches to flexible job shop scheduling problems
P Fattahi, M Saidi Mehrabad, F Jolai
Journal of intelligent manufacturing 18, 331-342, 2007
5412007
Flexible job shop scheduling with tabu search algorithms
M Saidi-Mehrabad, P Fattahi
The international journal of Advanced Manufacturing technology 32, 563-570, 2007
3002007
Dynamic scheduling in flexible job shop systems by considering simultaneously efficiency and stability
P Fattahi, A Fallahi
CIRP Journal of Manufacturing Science and Technology 2 (2), 114-123, 2010
1772010
A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem
P Fattahi, A Roshani, A Roshani
The International Journal of Advanced Manufacturing Technology 53, 363-378, 2011
1522011
Flexible job shop scheduling with overlapping in operations
P Fattahi, F Jolai, J Arkat
Applied Mathematical Modelling 33 (7), 3076-3087, 2009
1372009
A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations
P Fattahi, SMH Hosseini, F Jolai, R Tavakkoli-Moghaddam
Applied Mathematical Modelling 38 (1), 119-134, 2014
1262014
A compromise programming model to integrated urban water management
P Fattahi, S Fayyaz
Water resources management 24, 1211-1227, 2010
1202010
Multi-objective multi-layer congested facility location-allocation problem optimization with Pareto-based meta-heuristics
V Hajipour, P Fattahi, M Tavana, D Di Caprio
Applied Mathematical Modelling 40 (7-8), 4948-4969, 2016
852016
A robust optimization model for multi-product two-stage capacitated production planning under uncertainty
D Rahmani, R Ramezanian, P Fattahi, M Heydari
Applied Mathematical Modelling 37, 8957-8971, 2013
842013
A bi-objective continuous review inventory control model: Pareto-based meta-heuristic algorithms
P Fattahi, V Hajipour, A Nobari
Applied Soft Computing 32, 211-223, 2015
832015
Hybrid firefly-simulated annealing algorithm for the flow shop problem with learning effects and flexible maintenance activities
B Vahedi Nouri, P Fattahi, R Ramezanian
International Journal of Production Research 51 (12), 3501-3515, 2013
802013
Cost-oriented two-sided assembly line balancing problem: A simulated annealing approach
A Roshani, P Fattahi, A Roshani, M Salehi, A Roshani
International Journal of Computer Integrated Manufacturing 25 (8), 689-715, 2012
722012
A mathematical model and extension algorithm for assembly flexible flow shop scheduling problem
P Fattahi, SMH Hosseini, F Jolai
The International Journal of Advanced Manufacturing Technology 65, 787-802, 2013
702013
MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints
R Ramezanian, M Saidi-Mehrabad, P Fattahi
Journal of Manufacturing Systems 32 (2), 392-401, 2013
692013
Sequencing the mixed-model assembly line to minimize the total utility and idle costs with variable launching interval
P Fattahi, M Salehi
The International Journal of Advanced Manufacturing Technology 45, 987-998, 2009
692009
A hybrid multi-objective genetic algorithm based on the ELECTRE method for a capacitated flexible job shop scheduling problem
M Rohaninejad, A Kheirkhah, P Fattahi, B Vahedi-Nouri
The International Journal of Advanced Manufacturing Technology 77, 51-66, 2015
682015
A mathematical model and genetic algorithm to cyclic flexible job shop scheduling problem
A Jalilvand-Nejad, P Fattahi
Journal of Intelligent Manufacturing 26, 1085-1098, 2015
592015
Minimizing total flow time for the non-permutation flow shop scheduling problem with learning effects and availability constraints
B Vahedi-Nouri, P Fattahi, R Ramezanian
Journal of Manufacturing Systems 32 (1), 167-173, 2013
532013
A new hybrid particle swarm optimization and parallel variable neighborhood search algorithm for flexible job shop scheduling with assembly process
P Fattahi, N Bagheri Rad, F Daneshamooz, S Ahmadi
Assembly Automation 40 (3), 419-432, 2020
502020
Multi-objective meta-heuristics to solve three-stage assembly flow shop scheduling problem with machine availability constraints
N Shoaardebili, P Fattahi
International Journal of Production Research 53 (3), 944-968, 2015
462015
The system can't perform the operation now. Try again later.
Articles 1–20