Follow
Behdin Vahedi-Nouri
Title
Cited by
Cited by
Year
Hybrid firefly-simulated annealing algorithm for the flow shop problem with learning effects and flexible maintenance activities
B Vahedi Nouri, P Fattahi, R Ramezanian
International Journal of Production Research 51 (12), 3501-3515, 2013
782013
A hybrid multi-objective genetic algorithm based on the ELECTRE method for a capacitated flexible job shop scheduling problem
M Rohaninejad, A Kheirkhah, P Fattahi, B Vahedi-Nouri
The International Journal of Advanced Manufacturing Technology 77, 51-66, 2015
652015
A multi-objective model for a nurse scheduling problem by emphasizing human factors
M Hamid, R Tavakkoli-Moghaddam, F Golpaygani, B Vahedi-Nouri
Proceedings of the institution of mechanical engineers, Part H: journal of …, 2020
572020
Minimizing total flow time for the non-permutation flow shop scheduling problem with learning effects and availability constraints
B Vahedi-Nouri, P Fattahi, R Ramezanian
Journal of Manufacturing Systems 32 (1), 167-173, 2013
532013
A general flow shop scheduling problem with consideration of position-based learning effect and multiple availability constraints
B Vahedi-Nouri, P Fattahi, R Tavakkoli-Moghaddam, R Ramezanian
The International Journal of Advanced Manufacturing Technology 73, 601-611, 2014
432014
Scheduling of human-robot collaboration in assembly of printed circuit boards: a constraint programming approach
M Mokhtarzadeh, R Tavakkoli-Moghaddam, B Vahedi-Nouri, A Farsi
International Journal of Computer Integrated Manufacturing 33 (5), 460-473, 2020
322020
Two hybrid tabu search–firefly algorithms for the capacitated job shop scheduling problem with sequence-dependent setup cost
M Rohaninejad, AS Kheirkhah, B Vahedi Nouri, P Fattahi
International Journal of Computer Integrated Manufacturing 28 (5), 470-487, 2015
312015
A new weighted distance-based approximation methodology for flow shop scheduling group decisions under the interval-valued fuzzy processing time
Y Dorfeshan, R Tavakkoli-Moghaddam, SM Mousavi, B Vahedi-Nouri
Applied Soft Computing 91, 106248, 2020
282020
Minimizing the total completion time on a single machine with the learning effect and multiple availability constraints
B Vahedi-Nouri, P Fattahi, M Rohaninejad, R Tavakkoli-Moghaddam
Applied Mathematical Modelling 37 (5), 3126-3137, 2013
282013
A hybrid learning-based meta-heuristic algorithm for scheduling of an additive manufacturing system consisting of parallel SLM machines
M Rohaninejad, R Tavakkoli-Moghaddam, B Vahedi-Nouri, Z Hanzálek, ...
International Journal of Production Research 60 (20), 6205-6225, 2022
272022
A New Approach to Cooperative Competition in Facility Location Problems: Mathematical Formulations and an Approximation Algorithm
M Rohaninejad, H Navidi, B Vahedi Nouri, R Kamranrad
Computers & Operations Research, 2017
262017
Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops
M Rohaninejada, R Sahraeiana, B Vahedi Nouri
RAIRO-Operations Research 50 (3), 587-609, 2016
262016
Incorporating order acceptance, pricing and equity considerations in the scheduling of cloud manufacturing systems: matheuristic methods
B Vahedi-Nouri, R Tavakkoli-Moghaddam, Z Hanzálek, H Arbabi, ...
International Journal of Production Research 59 (7), 2009-2027, 2021
252021
Scheduling of multi-robot job shop systems in dynamic environments: mixed-integer linear programming and constraint programming approaches
S Fatemi-Anaraki, R Tavakkoli-Moghaddam, M Foumani, B Vahedi-Nouri
Omega 115, 102770, 2023
222023
Simultaneous waterway scheduling, berth allocation, and quay crane assignment: A novel matheuristic approach
S Fatemi-Anaraki, R Tavakkoli-Moghaddam, D Abdolhamidi, ...
International Journal of Production Research 59 (24), 7576-7593, 2021
222021
Workforce planning and production scheduling in a reconfigurable manufacturing system facing the COVID-19 pandemic
B Vahedi-Nouri, R Tavakkoli-Moghaddam, Z Hanzálek, A Dolgui
Journal of Manufacturing Systems 63, 563-574, 2022
212022
New products or remanufactured products: Which is consumer-friendly under a closed-loop multi-level supply chain?
AA Taleizadeh, MS Moshtagh, B Vahedi-Nouri, B Sarkar
Journal of Retailing and Consumer Services 73, 103295, 2023
202023
Bi-objective collaborative electric vehicle routing problem: Mathematical modeling and matheuristic approach
B Vahedi-Nouri, H Arbabi, F Jolai, R Tavakkoli-Moghaddam, ...
Journal of Ambient Intelligence and Humanized Computing 14 (8), 10277-10297, 2023
162023
A multi-objective scheduling model for a cloud manufacturing system with pricing, equity, and order rejection
B Vahedi-Nouri, R Tavakkoli-Moghaddam, M Rohaninejad
IFAC-PapersOnLine 52 (13), 2177-2182, 2019
152019
A bi-objective scheduling model for additive manufacturing with multiple materials and sequence-dependent setup time
R Tavakkoli-Moghaddam, S Shirazian, B Vahedi-Nouri
IFIP International Conference on Advances in Production Management Systems …, 2020
92020
The system can't perform the operation now. Try again later.
Articles 1–20