Follow
Umut Besikci
Umut Besikci
Triodor Software
Verified email at boun.edu.tr
Title
Cited by
Cited by
Year
Green scheduling of a two-machine flowshop: Trade-off between makespan and energy consumption
SA Mansouri, E Aktas, U Besikci
European Journal of Operational Research 248 (3), 772-788, 2016
3032016
Multi-mode resource constrained multi-project scheduling and resource portfolio problem
U Beşikci, Ü Bilge, G Ulusoy
European Journal of Operational Research 240 (1), 22-31, 2015
1762015
Resource dedication problem in a multi-project environment
U Beşikci, Ü Bilge, G Ulusoy
Flexible Services and Manufacturing Journal 25, 206-229, 2013
692013
Resource portfolio problem under relaxed resource dedication policy in multi-mode multi-project scheduling
U Beşikçi, Ü Bilge, G Ulusoy
International Journal of Mathematics in Operational Research 14 (4), 541-567, 2019
72019
Mathematical models for FMS loading and part type selection with flexible process plans
Ü Bilge, E Albey, U Beşikci, K Erbatur, AN Arslan
European Journal of Industrial Engineering 9 (2), 171-194, 2015
62015
Different resource management policies in multi-mode resource constrained multi-project scheduling
U Beşikçi, Ü Bilge, G Ulusoy
Institute of Electrical and Electronics Engineers, Inc. 2, 64-67, 2011
52011
A combination of different resource management policies in a multi-project environment
U Besikci, G Ulusoy, Ü Bilge
Proceedings of 2013 International Conference on Industrial Engineering and …, 2013
22013
A modied branch and cut procedure for resource portfolio problem under relaxed resource dedication policy
U Beşikci, Ü Bilge, G Ulusoy
12012
Resource portfolio problem under relaxed resource dedication policy in a multi-project environment
U Beşikçi, Ü Bilge, G Ulusoy
Catholic University, 2012
2012
Resource preference based improvement heuristics for resource portfolio problem
U Beşikçi, Ü Bilge, G Ulusoy
Tadbir, Vancouver, Canada 3, 313-322, 2011
2011
The system can't perform the operation now. Try again later.
Articles 1–10