Follow
Jiyin Liu
Jiyin Liu
Professor of Operations Management, Loughborough University
Verified email at lboro.ac.uk - Homepage
Title
Cited by
Cited by
Year
Storage space allocation in container terminals
C Zhang, J Liu, Y Wan, KG Murty, RJ Linn
Transportation Research Part B: Methodological 37 (10), 883-903, 2003
5902003
Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling
BL Maccarthy, J Liu
The International Journal of Production Research 31 (1), 59-79, 1993
5741993
A review of planning and scheduling systems and methods for integrated steel production
L Tang, J Liu, A Rong, Z Yang
European Journal of operational research 133 (1), 1-20, 2001
5372001
A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex
L Tang, J Liu, A Rong, Z Yang
European Journal of Operational Research 124 (2), 267-282, 2000
5122000
A decision support system for operations in a container terminal
KG Murty, J Liu, Y Wan, R Linn
Decision support systems 39 (3), 309-332, 2005
4472005
Dynamic crane deployment in container storage yards
C Zhang, Y Wan, J Liu, RJ Linn
Transportation Research Part B: Methodological 36 (6), 537-555, 2002
3932002
A mathematical programming model for scheduling steelmaking-continuous casting production
L Tang, J Liu, A Rong, Z Yang
European Journal of Operational Research 120 (2), 423-435, 2000
3432000
Differential evolution with an individual-dependent mechanism
L Tang, Y Dong, J Liu
IEEE Transactions on Evolutionary Computation 19 (4), 560-574, 2014
2992014
An improved differential evolution algorithm for practical dynamic scheduling in steelmaking-continuous casting production
L Tang, Y Zhao, J Liu
IEEE Transactions on Evolutionary Computation 18 (2), 209-225, 2013
2912013
Steel-making process scheduling using Lagrangian relaxation
L Tang, PB Luh, J Liu, L Fang
International Journal of Production Research 40 (1), 55-70, 2002
2872002
Constructive and composite heuristic solutions to the P//∑ Ci scheduling problem
J Liu, CR Reeves
European Journal of Operational Research 132 (2), 439-452, 2001
2712001
Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
J Liu, Y Wan, L Wang
Naval Research Logistics (NRL) 53 (1), 60-74, 2006
2102006
The assignment of storage locations to containers for a container stack
Y Wan, J Liu, PC Tsai
Naval Research Logistics (NRL) 56 (8), 699-713, 2009
1622009
Hongkong International Terminals gains elastic capacity using a data-intensive decision-support system
KG Murty, Y Wan, J Liu, MM Tseng, E Leung, KK Lai, HWC Chiu
Interfaces 35 (1), 61-75, 2005
1392005
A new classification scheme for flexible manufacturing systems
BL MacCarthy, J Liu
The International Journal of Production Research 31 (2), 299-309, 1993
1371993
Modeling and solution of the joint quay crane and truck scheduling problem
L Tang, J Zhao, J Liu
European Journal of Operational Research 236 (3), 978-990, 2014
1352014
Mixed truck delivery systems with both hub-and-spoke and direct shipment
J Liu, CL Li, CY Chan
Transportation Research Part E: Logistics and Transportation Review 39 (4 …, 2003
1342003
Rubber tired gantry crane deployment for container yard operation
R Linn, J Liu, Y Wan, C Zhang, KG Murty
Computers & Industrial Engineering 45 (3), 429-442, 2003
1232003
A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment
L Tang, W Liu, J Liu
Journal of Intelligent Manufacturing 16, 361-370, 2005
1212005
A new Lagrangian relaxation algorithm for hybrid flowshop scheduling to minimize total weighted completion time
L Tang, H Xuan, J Liu
Computers & Operations Research 33 (11), 3344-3359, 2006
1162006
The system can't perform the operation now. Try again later.
Articles 1–20