João Pombo
João Pombo
University of Huddersfield and Instituto Superior Técnico & ISEL, IPL Lisbon
Verified email at dem.ist.utl.pt - Homepage
TitleCited byYear
A new wheel–rail contact model for railway dynamics
J Pombo, J Ambrósio, M Silva
Vehicle System Dynamics 45 (2), 165-189, 2007
1552007
Influence of the aerodynamic forces on the pantograph–catenary system for high-speed trains
J Pombo, J Ambrósio, M Pereira, F Rauter, A Collina, A Facchinetti
Vehicle System Dynamics 47 (11), 1327-1347, 2009
1112009
Application of a wheel–rail contact model to railway dynamics in small radius curved tracks
JC Pombo, JAC Ambrósio
Multibody System Dynamics 19 (1-2), 91-114, 2008
1012008
Development of a wear prediction tool for steel railway wheels using three alternative wear functions
J Pombo, J Ambrosio, M Pereira, R Lewis, R Dwyer-Joyce, C Ariaudo, ...
Wear 271 (1-2), 238-245, 2011
872011
A computational procedure for the dynamic analysis of the catenary-pantograph interaction in high-speed trains
J Ambrósio, J Pombo, M Pereira, P Antunes, A Mósca
Journal of Theoretical and Applied Mechanics 50 (3), 681-699, 2012
802012
A memory based communication in the co-simulation of multibody and finite element codes for pantograph-catenary interaction simulation
J Ambrósio, J Pombo, F Rauter, M Pereira
Multibody dynamics, 231-252, 2009
752009
Influence of pantograph suspension characteristics on the contact quality with the catenary for high speed trains
J Pombo, J Ambrósio
Computers & Structures 110, 32-42, 2012
742012
General spatial curve joint for rail guided vehicles: kinematics and dynamics
J Pombo, JAC Ambrósio
Multibody system dynamics 9 (3), 237-264, 2003
742003
A study on wear evaluation of railway wheels based on multibody dynamics and wear computation
J Pombo, J Ambrósio, M Pereira, R Lewis, R Dwyer-Joyce, C Ariaudo, ...
Multibody System Dynamics 24 (3), 347-366, 2010
672010
Contact model for the pantograph-catenary interaction
FG Rauter, J Pombo, J Ambrósio, J Chalansonnet, A Bobillot, MS Pereira
Journal of System Design and Dynamics 1 (3), 447-457, 2007
622007
An alternative method to include track irregularities in railway vehicle dynamic analyses
J Pombo, J Ambrósio
Nonlinear Dynamics 68 (1-2), 161-176, 2012
582012
Mapping railway wheel material wear mechanisms and transitions
R Lewis, RS Dwyer-Joyce, U Olofsson, J Pombo, J Ambrosio, M Pereira, ...
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of …, 2010
572010
Environmental and track perturbations on multiple pantograph interaction with catenaries in high-speed trains
J Pombo, J Ambrósio
Computers & Structures 124, 88-101, 2013
472013
Optimization of high-speed railway pantographs for improving pantograph-catenary contact
J Ambrósio, J Pombo, M Pereira
Theoretical and Applied Mechanics Letters 3 (1), 013006, 2013
432013
Recent developments in pantograph-catenary interaction modelling and analysis
J Ambrosio, J Pombo, M Pereira, P Antunes, A Mosca
International Journal of Railway Technology 1 (1), 249-278, 2012
422012
Railway critical velocity–Analytical prediction and analysis
SB Mezher, DP Connolly, PK Woodward, O Laghrouche, J Pombo, ...
Transportation Geotechnics 6, 84-96, 2016
412016
A railway wheel wear prediction tool based on a multibody software
J Pombo, J Ambrósio, M Pereira, R Lewis, R Dwyer-Joyce, C Ariaudo, ...
Journal of theoretical and applied mechanics 48, 751-770, 2010
412010
Multiple pantograph interaction with catenaries in high-speed trains
JÃĢ Pombo, J AmbrÃģsio
Journal of Computational and Nonlinear Dynamics 7 (4), 041008, 2012
402012
A multibody methodology for railway dynamics applications
J Pombo, J Ambrósio
Tech-nical Report IDMEC/CPM-2004/003, IDMEC-Institute of Mechanical …, 2004
392004
Influence of track conditions and wheel wear state on the loads imposed on the infrastructure by railway vehicles
J Pombo, J Ambrosio, M Pereira, R Verardi, C Ariaudo, N Kuka
Computers & Structures 89 (21-22), 1882-1894, 2011
332011
The system can't perform the operation now. Try again later.
Articles 1–20