Follow
Ibrahim Bakry
Ibrahim Bakry
Associate Professor of Civil Engineering, American University in Dubai
Verified email at aud.edu
Title
Cited by
Cited by
Year
Optimized acceleration of repetitive construction projects
I Bakry, O Moselhi, T Zayed
Automation in construction 39, 145-151, 2014
792014
Optimized scheduling and buffering of repetitive construction projects under uncertainty
I Bakry, O Moselhi, T Zayed
Engineering, Construction and Architectural Management 23 (6), 782-800, 2016
602016
Estimating productivity of earthmoving operations using spatial technologies
A Montaser, I Bakry, A Alshibani, O Moselhi
Canadian Journal of Civil Engineering 39 (9), 1072-1082, 2012
532012
Estimating productivity of earthmoving operations using spatial technologies
A Montaser, I Bakry, A Alshibani, O Moselhi
Canadian Journal of Civil Engineering 39 (9), 1072-1082, 2012
532012
Decision support model for integrated risk assessment and prioritization of intervention plans of municipal infrastructure
H Elsawah, I Bakry, O Moselhi
Journal of Pipeline Systems Engineering and Practice 7 (4), 04016010, 2016
512016
Condition prediction for cured-in-place pipe rehabilitation of sewer mains
I Bakry, H Alzraiee, ME Masry, K Kaddoura, T Zayed
Journal of Performance of Constructed Facilities 30 (5), 04016016, 2016
362016
Condition prediction for chemical grouting rehabilitation of sewer networks
I Bakry, H Alzraiee, K Kaddoura, M El Masry, T Zayed
Journal of Performance of Constructed Facilities 30 (6), 04016042, 2016
332016
Application of lean principles to design processes in construction consultancy firms
M Marzouk, I Bakry, M El-Said
International Journal of Construction Supply Chain Management 1 (1), 43-55, 2011
322011
Assessing design process in engineering consultancy firms using lean principles
M Marzouk, I Bakry, M El-Said
Simulation 88 (12), 1522-1536, 2012
202012
Destructive analysis-based testing for cured-in-place pipe
H Alzraiee, I Bakry, T Zayed
Journal of Performance of Constructed Facilities 29 (4), 04014095, 2015
172015
Fuzzy dynamic programming for optimized scheduling of repetitive construction projects
I Bakry, O Moselhi, T Zayed
2013 Joint IFSA World Congress and NAFIPS Annual Meeting (IFSA/NAFIPS), 1172 …, 2013
142013
Fuzzy dynamic programming for optimized scheduling of repetitive construction projects
I Bakry, O Moselhi, T Zayed
2013 Joint IFSA World Congress and NAFIPS Annual Meeting (IFSA/NAFIPS), 1172 …, 2013
142013
Optimized scheduling of repetitive construction projects under uncertainty
I Bakry
Concordia University, 2014
102014
A retrospective evaluation of cured-in-place pipe (CIPP) rehabilitation technique used in municipal sewers
H Alzraiee, I Bakry, T Zayed
Proceedings, NASTT No-Dig Sacramento, 1-9, 2013
82013
Accelerating repetitive construction projects: With uncertainty and contractors’ judgment
O Moselhi, I Bakry, A Alshibani
Canadian Journal of Civil Engineering 43 (11), 949-957, 2016
72016
Fuzzy scheduling of repetitive construction projects
I Bakry, O Moselhi, T Zayed
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2013
72013
Evaluating the effect of TQM on MEP construction productivity and project delivery in Dubai
EP Small, I Bakry, L Ayyash
International Journal of Construction Management 21 (10), 1061-1075, 2021
62021
Multi-tiered database schema for integrated municipal asset management
I Bakry, H Elsawah, O Moselhi
Construction Research Congress 2016, 1567-1576, 2016
32016
Contractor Prequalification Model for Lean Project Delivery
I Bakry, E Daoud
Int. J Sup. Chain. Mgt Vol 8 (4), 1131, 2019
22019
Sustainable Site Selection: An AHP-MAUT Decision-Making Approach using a GIS Platform
RD andIbrahim Bakry
Proceedings of the Creative Construction e-Conference, 045, 2022
12022
The system can't perform the operation now. Try again later.
Articles 1–20