de Araujo, S. A.
Title
Cited by
Cited by
Year
Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups
SA de Araujo, MN Arenales, AR Clark
Journal of Heuristics 13 (4), 337-358, 2007
1342007
Lot sizing and furnace scheduling in small foundries
SA de Araujo, MN Arenales, AR Clark
Computers & Operations Research 35 (3), 916-932, 2008
1292008
Problema de dimensionamento de lotes monoestágio com restrição de capacidade: modelagem, método de resolução e resultados computacionais
SA Araujo, MN Arenales
Pesquisa Operacional 20 (2), 287-306, 2000
442000
SART: an intelligent assistant system for subway control
P Brézillon, R Naveiro, M Cavalcanti, JC Pomerol
Pesquisa Operacional 20 (2), 247-268, 2000
412000
Dimensionamento de lotes e programação do forno numa fundição de pequeno porte
SA Araujo, MN Arenales, AR Clark
Gestão & Produção 11 (2), 165-176, 2004
402004
Classification and literature review of integrated lot-sizing and cutting stock problems
GM Melega, SA de Araujo, R Jans
European Journal of Operational Research 271 (1), 1-19, 2018
362018
Period decompositions for the capacitated lot sizing problem with setup times
SA De Araujo, B De Reyck, Z Degraeve, I Fragkos, R Jans
INFORMS Journal on Computing 27 (3), 431-448, 2015
352015
Mathematical models and a heuristic method for the multiperiod one-dimensional cutting stock problem
KC Poldi, SA de Araujo
Annals of Operations Research 238 (1-2), 497-520, 2016
292016
INTEGRATED CUTTING MACHINE PROGRAMMING AND LOT SIZING IN FURNITURE INDUSTRY
SG dos Santos, SA de Araujo, S Rangel
Pesquisa Operacional para o Desenvolvimento 3 (1), 249-266, 2011
282011
Hybrid methods for lot sizing on parallel machines
DJ Fiorotto, SA de Araujo, R Jans
Computers & Operations Research 63, 136-148, 2015
272015
An evolutionary algorithm for the one‐dimensional cutting stock problem
SA Araujo, AA Constantino, KC Poldi
International Transactions in Operational Research 18 (1), 115-127, 2010
272010
Dimensionamento de lotes e programação do forno numa fundição automatizada de porte médio
SA Araujo, MN Arenales
Pesquisa Operacional 23 (3), 403-420, 2003
272003
Cambios y permanencias: investigando la paternidad en contextos de baja renta
MJF Toneli, A Beiras, AS Lodetti, D De Lucca, M de Andrade Gomes, ...
Revista Interamericana de Psicología/Interamerican Journal of Psychology 40 …, 2006
262006
Recrutamento on-line: estudo da percepção de utilização da internet em empresa de consultoria de recursos humanos
S Araújo, A Ramos
XXII Encontro Nacional de Engenharia, 1-8, 2002
262002
Reformulation and a Lagrangian heuristic for lot sizing problem on parallel machines
DJ Fiorotto, SA de Araujo
Annals of Operations Research 217 (1), 213-231, 2014
252014
The integrated lot sizing and cutting stock problem with saw cycle constraints applied to furniture production
M Vanzela, GM Melega, S Rangel, SA de Araujo
Computers & Operations Research 79, 148-160, 2017
202017
Modelos e métodos para o planejamento e programação da produção aplicados no setor de fundições
SA Araujo
Modelos e Métodos para o Planejamento e Programação da Produção Aplicados no …, 2003
192003
A genetic algorithm for the one-dimensional cutting stock problem with setups
SA Araujo, KC Poldi, J Smith
Pesquisa Operacional 34 (2), 165-187, 2014
182014
A família vivienciando o transplante cardíaco
LMPM Brito, VLMP Pessoa, ZMSA Santos
Revista Brasileira de Enfermagem 60 (2), 167-171, 2007
182007
A priori reformulations for joint rolling-horizon scheduling of materials processing and lot-sizing problem
SA Araujo, A Clark
Computers & Industrial Engineering 65 (4), 577-585, 2013
172013
The system can't perform the operation now. Try again later.
Articles 1–20