Følg
Ali Allahverdi
Ali Allahverdi
Industrial Engineering Department, Gazi University
Verificeret mail på gazi.edu.tr
Titel
Citeret af
Citeret af
År
A survey of scheduling problems with setup times or costs
A Allahverdi, CT Ng, TCE Cheng, MY Kovalyov
European journal of operational research 187 (3), 985-1032, 2008
17802008
A review of scheduling research involving setup considerations
A Allahverdi, JND Gupta, T Aldowaisan
Omega 27 (2), 219-239, 1999
13231999
The third comprehensive survey on scheduling problems with setup times/costs
A Allahverdi
European journal of operational research 246 (2), 345-378, 2015
5892015
The significance of reducing setup times/setup costs
A Allahverdi, HM Soroush
European Journal of Operational Research 187 (3), 978-984, 2008
3582008
New heuristics for no-wait flowshops to minimize makespan
T Aldowaisan, A Allahverdi
Computers & Operations Research 30 (8), 1219-1231, 2003
2482003
A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
A Allahverdi, FS Al-Anzi
Computers & Operations Research 33 (4), 1056-1080, 2006
2252006
A survey of scheduling problems with no-wait in process
A Allahverdi
European Journal of Operational Research 255 (3), 665-686, 2016
2232016
New heuristics for m-machine no-wait flowshop to minimize total completion time
T Aldowaisan, A Allahverdi
Omega 32 (5), 345-352, 2004
1722004
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
FS Al-Anzi, A Allahverdi
European Journal of Operational Research 182 (1), 80-94, 2007
1692007
Total flowtime in no-wait flowshops with separated setup times
T Aldowaisan, A Allahverdi
Computers & Operations Research 25 (9), 757-765, 1998
1241998
The two-stage assembly scheduling problem to minimize total completion time with setup times
A Allahverdi, FS Al-Anzi
Computers & Operations Research 36 (10), 2740-2747, 2009
1132009
New heuristics to minimize total completion time in m-machine flowshops
A Allahverdi, T Aldowaisan
International Journal of Production Economics 77 (1), 71-83, 2002
1132002
Optimizing modular product design for reconfigurable manufacturing
AS Yigit, AG Ulsoy, A Allahverdi
Journal of Intelligent Manufacturing 13, 309-316, 2002
1062002
The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time
A Allahverdi, FS Al-Anzi
The International Journal of Advanced Manufacturing Technology 37, 166-177, 2008
1022008
Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times
A Allahverdi
Computers & Operations Research 27 (2), 111-127, 2000
1022000
Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
A Allahverdi, FS Al-Anzi
International Journal of Production Research 44 (22), 4713-4735, 2006
922006
A hybrid tabu search heuristic for the two-stage assembly scheduling problem
FS Al-Anzi, A Allahverdi
International Journal of Operations Research 3 (2), 109-119, 2006
832006
A new heuristic for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness
A Allahverdi
Computers & Operations Research 31 (2), 157-180, 2004
822004
The two stage assembly flowshop scheduling problem to minimize total tardiness
A Allahverdi, H Aydilek
Journal of Intelligent Manufacturing 26, 225-237, 2015
802015
Optimal selection of module instances for modular products in reconfigurable manufacturing systems
AS Yigit, A Allahverdi
International Journal of Production Research 41 (17), 4063-4074, 2003
792003
Systemet kan ikke foretage handlingen nu. Prøv igen senere.
Artikler 1–20