A survey of scheduling problems with setup times or costs A Allahverdi, CT Ng, TCE Cheng, MY Kovalyov European journal of operational research 187 (3), 985-1032, 2008 | 1780 | 2008 |
A review of scheduling research involving setup considerations A Allahverdi, JND Gupta, T Aldowaisan Omega 27 (2), 219-239, 1999 | 1323 | 1999 |
The third comprehensive survey on scheduling problems with setup times/costs A Allahverdi European journal of operational research 246 (2), 345-378, 2015 | 589 | 2015 |
The significance of reducing setup times/setup costs A Allahverdi, HM Soroush European Journal of Operational Research 187 (3), 978-984, 2008 | 358 | 2008 |
New heuristics for no-wait flowshops to minimize makespan T Aldowaisan, A Allahverdi Computers & Operations Research 30 (8), 1219-1231, 2003 | 248 | 2003 |
A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application A Allahverdi, FS Al-Anzi Computers & Operations Research 33 (4), 1056-1080, 2006 | 225 | 2006 |
A survey of scheduling problems with no-wait in process A Allahverdi European Journal of Operational Research 255 (3), 665-686, 2016 | 223 | 2016 |
New heuristics for m-machine no-wait flowshop to minimize total completion time T Aldowaisan, A Allahverdi Omega 32 (5), 345-352, 2004 | 172 | 2004 |
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times FS Al-Anzi, A Allahverdi European Journal of Operational Research 182 (1), 80-94, 2007 | 169 | 2007 |
Total flowtime in no-wait flowshops with separated setup times T Aldowaisan, A Allahverdi Computers & Operations Research 25 (9), 757-765, 1998 | 124 | 1998 |
The two-stage assembly scheduling problem to minimize total completion time with setup times A Allahverdi, FS Al-Anzi Computers & Operations Research 36 (10), 2740-2747, 2009 | 113 | 2009 |
New heuristics to minimize total completion time in m-machine flowshops A Allahverdi, T Aldowaisan International Journal of Production Economics 77 (1), 71-83, 2002 | 113 | 2002 |
Optimizing modular product design for reconfigurable manufacturing AS Yigit, AG Ulsoy, A Allahverdi Journal of Intelligent Manufacturing 13, 309-316, 2002 | 106 | 2002 |
The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time A Allahverdi, FS Al-Anzi The International Journal of Advanced Manufacturing Technology 37, 166-177, 2008 | 102 | 2008 |
Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times A Allahverdi Computers & Operations Research 27 (2), 111-127, 2000 | 102 | 2000 |
Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times A Allahverdi, FS Al-Anzi International Journal of Production Research 44 (22), 4713-4735, 2006 | 92 | 2006 |
A hybrid tabu search heuristic for the two-stage assembly scheduling problem FS Al-Anzi, A Allahverdi International Journal of Operations Research 3 (2), 109-119, 2006 | 83 | 2006 |
A new heuristic for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness A Allahverdi Computers & Operations Research 31 (2), 157-180, 2004 | 82 | 2004 |
The two stage assembly flowshop scheduling problem to minimize total tardiness A Allahverdi, H Aydilek Journal of Intelligent Manufacturing 26, 225-237, 2015 | 80 | 2015 |
Optimal selection of module instances for modular products in reconfigurable manufacturing systems AS Yigit, A Allahverdi International Journal of Production Research 41 (17), 4063-4074, 2003 | 79 | 2003 |