Follow
Reha Uzsoy
Reha Uzsoy
Verified email at ncsu.edu
Title
Cited by
Cited by
Year
Executing production schedules in the face of uncertainties: A review and some future directions
H Aytug, MA Lawley, K McKay, S Mohan, R Uzsoy
European Journal of Operational Research 161 (1), 86-110, 2005
9492005
A review of production planning and scheduling models in the semiconductor industry part I: system characteristics, performance evaluation and production planning
R Uzsoy, CY Lee, LA Martin-Vega
IIE transactions 24 (4), 47-60, 1992
8621992
Efficient algorithms for scheduling semiconductor burn-in operations
CY Lee, R Uzsoy, LA Martin-Vega
Operations Research 40 (4), 764-775, 1992
6081992
A review of production planning and scheduling models in the semiconductor industry part II: shop-floor control
R Uzsoy, CY Lee, LA Martin-Vega
IIE transactions 26 (5), 44-55, 1994
5671994
Scheduling a single batch processing machine with non-identical job sizes
R Uzsoy
THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 32 (7), 1615-1635, 1994
5241994
Experimental evaluation of heuristic optimization algorithms: A tutorial
RL Rardin, R Uzsoy
Journal of Heuristics 7 (3), 261-304, 2001
4792001
Analysis of periodic and event-driven rescheduling policies in dynamic shops
LK Church, R Uzsoy
International Journal of Computer Integrated Manufacturing 5 (3), 153-163, 1992
3931992
Predictable scheduling of a job shop subject to breakdowns
SV Mehta, RM Uzsoy
IEEE Transactions on Robotics and Automation 14 (3), 365-378, 1998
3471998
Benchmarks for shop scheduling problems
E Demirkol, S Mehta, R Uzsoy
European Journal of Operational Research 109 (1), 137-141, 1998
3291998
Decomposition methods for complex factory scheduling problems
IM Ovacik, R Uzsoy
Springer Science & Business Media, 2012
3132012
Minimizing total completion time on batch processing machines
V Chandru, CY Lee, R Uzsoy
THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 31 (9), 2097-2121, 1993
2861993
Scheduling batch processing machines with incompatible job families
R Uzsoy
International Journal of Production Research 33 (10), 2685-2708, 1995
2741995
Outbound supply chain network design with mode selection, lead times and capacitated vehicle distribution centers
E Eskigun, R Uzsoy, PV Preckel, G Beaujon, S Krishnan, JD Tew
European Journal of Operational Research 165 (1), 182-206, 2005
2602005
Rapid modeling and discovery of priority dispatching rules: An autonomous learning approach
CD Geiger, R Uzsoy, H Aytuğ
Journal of Scheduling 9 (1), 7-34, 2006
2352006
Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times
IM Ovacikt, R Uzsoy
The international Journal of Production Research 32 (6), 1243-1263, 1994
2341994
Minimizing total tardiness on a batch processing machine with incompatible job families
SV Mehta, R Uzsoy
IIE transactions 30 (2), 165-178, 1998
2321998
Predictable scheduling of a single machine with breakdowns and sensitive jobs
R O'Donovan, R Uzsoy, KN McKay
International Journal of Production Research 37 (18), 4217-4233, 1999
2151999
Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times
IM Ovacik, R Uzsoy
International journal of production research 33 (11), 3173-3192, 1995
2071995
A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families
S Malve, R Uzsoy
Computers & Operations Research 34 (10), 3016-3028, 2007
2052007
A genetic algorithm to minimize maximum lateness on a batch processing machine
CS Wang, R Uzsoy
Computers & Operations Research 29 (12), 1621-1640, 2002
1992002
The system can't perform the operation now. Try again later.
Articles 1–20