Follow
Gary D Holt
Gary D Holt
Professor of Construction Management and Economics, University of Central Lancashire
Verified email at uclan.ac.uk - Homepage
Title
Cited by
Cited by
Year
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
PF Kaming, PO Olomolaiye, GD Holt, FC Harris
Construction Management & Economics 15 (1), 83-94, 1997
12981997
Using systems dynamics to better understand change and rework in construction project management systems
PED Love, GD Holt, LY Shen, H Li, Z Irani
International journal of project management 20 (6), 425-436, 2002
5482002
Which contractor selection methodology?
GD Holt
International Journal of project management 16 (3), 153-164, 1998
4931998
Triangulation in construction management research
PED Love, GD Holt, H Li
Engineering, construction and architectural management 9 (4), 294-303, 2002
3322002
Cost overrun in the Malaysian construction industry projects: A deeper insight
Z Shehu, IR Endut, A Akintoye, GD Holt
International journal of project management 32 (8), 1471-1480, 2014
3302014
Factors influencing craftsmen's productivity in Indonesia
PF Kaming, PO Olomolaiye, GD Holt, FC Harris
International journal of project management 15 (1), 21-30, 1997
2961997
Asking questions, analysing answers: relative importance revisited
GD Holt
Construction Innovation 14 (1), 2-16, 2014
2952014
A review of contractor selection practice in the UK construction industry
GD Holt, PO Olomolaiye, FC Harris
Building and environment 30 (4), 553-561, 1995
2591995
Lowest price or value? Investigation of UK construction clients' tender selection process
CH Wong, GD Holt, PA Cooper
Construction management and economics 18 (7), 767-774, 2000
2562000
Using national input/output data for embodied energy analysis of individual residential buildings
GJ Treloar, PED Love, GD Holt
Construction Management and Economics 19 (1), 49-61, 2001
2542001
Construction business performance measurement: the SPM alternative
PED Love, GD Holt
Business process management journal 6 (5), 408-416, 2000
2412000
A survey of constraints on Iranian construction operatives' productivity
M Zakeri, PO Olomolaiye, GD Holt, FC Harris
Construction Management & Economics 14 (5), 417-426, 1996
2361996
Factors influencing UK construction clients' choice of contractor
GD Holt, PO Olomolaiye, FC Harris
Building and Environment 29 (2), 241-248, 1994
2301994
The learning organisation: toward a paradigm for mutually beneficial strategic construction alliances
GD Holt, PED Love, H Li
International journal of project management 18 (6), 415-421, 2000
2282000
Location optimization for a group of tower cranes
P Zhang, FC Harris, PO Olomolaiye, GD Holt
Journal of construction engineering and management 125 (2), 115-122, 1999
2111999
Evaluating prequalification criteria in contractor selection
GD Holt, PO Olomolaiye, FC Harris
Building and Environment 29 (4), 437-448, 1994
1701994
FRP or steel plate-to-concrete bonded joints: Effect of test methods on experimental bond strength
JF Chen, ZJ Yang, GD Holt
Steel and Composite Structures 1 (2), 231-244, 2001
1692001
Severity diagnosis of productivity problems—a reliability analysis
PF Kaming, GD Holt, ST Kometa, PO Olomolaiye
International Journal of Project Management 16 (2), 107-113, 1998
1641998
Prequalification and multi-criteria selection: a measure of contractors' opinions
P Jennings, GD Holt
Construction Management & Economics 16 (6), 651-660, 1998
1531998
Predictive maintenance techniques and their relevance to construction plant
DJ Edwards, GD Holt, FC Harris
Journal of Quality in Maintenance Engineering 4 (1), 25-37, 1998
1511998
The system can't perform the operation now. Try again later.
Articles 1–20