Follow
M. Batuhan Ayhan
Title
Cited by
Cited by
Year
A fuzzy AHP approach for supplier selection problem: A case study in a Gear motor company
MB Ayhan
arXiv preprint arXiv:1311.2886, 2013
5462013
Reverse logistics system design for the waste of electrical and electronic equipment (WEEE) in Turkey
HS Kilic, U Cebeci, MB Ayhan
Resources, Conservation and Recycling 95, 120-132, 2015
2062015
A two stage approach for supplier selection problem in multi-item/multi-supplier environment with quantity discounts
MB Ayhan, HS Kilic
Computers & Industrial Engineering 85, 1-12, 2015
1842015
A quantitative approach for measuring process innovation: a case study in a manufacturing company
MB Ayhan, E Öztemel, ME Aydin, Y Yue
International Journal of Production Research 51 (11), 3463-3475, 2013
552013
Comparison of globoid and cylindrical shearer drums' loading performance
M Ayhan, EM Eyyuboglu
Journal of the Southern African Institute of Mining and Metallurgy 106 (1 …, 2006
392006
A new computer program for cutting head design of roadheaders and drum shearers
B Tiryaki, M Ayhan, OZ Hekimoglu
17th International Mining Congress and Exhibition of Turkey–IMCET, 655-662, 2001
332001
Kişilik özellikleri bağlaminda yaşam memnuniyeti üzerine bir araştirma
M Saygılı, ÖA Onay, M Ayhan
Yorum Yönetim Yöntem Uluslararası Yönetim Ekonomi ve Felsefe Dergisi 5 (2 …, 2017
322017
Effect of basic pumice on morphologic properties of interfacial transition zone in load-bearing lightweight/semi-lightweight concretes
M Ayhan, H Gönül, İA Gönül, A Karakuş
Construction and Building Materials 25 (5), 2507-2518, 2011
312011
A multi-agent based approach for change management in manufacturing enterprises
MB Ayhan, ME Aydin, E Öztemel
Journal of Intelligent Manufacturing 26, 975-988, 2015
262015
An approach for the determination and correlation of diversity and efficiency of software development teams
S Altiner, MB Ayhan
South African Journal of Science 114 (3-4), 1-9, 2018
242018
A methodology to measure the degre of managerial innovation
MB Ayhan, E Oztemel
Journal of Industrial Engineering and Management (JIEM) 7 (1), 153-173, 2014
242014
Fuzzy TOPSIS application for supplier selection problem
MB Ayhan
Business and Management 5 (2), 2013
232013
High-risk mesothelioma relation to meteorological and geological condition and distance from naturally occurring asbestos
A Abakay, AC Tanrikulu, M Ayhan, MS Imamoglu, M Taylan, MA Kaplan, ...
Environmental health and preventive medicine 21, 82-90, 2016
212016
An integrated hesitant fuzzy AHP and TOPSIS approach for selecting summer sport school
MB Ayhan
Sakarya University Journal of Science 22 (2), 269-284, 2018
152018
A new decision making approach for supplier selection: hesitant fuzzy axiomatic design
MB Ayhan
International Journal of Information Technology & Decision Making 17 (04 …, 2018
132018
Relationships between respiratory function disorders and serum copper levels in copper mineworkers
A Abakay, O Gokalp, O Abakay, O Evliyaoglu, C Sezgi, Y Palanci, F Ekici, ...
Biological trace element research 145, 151-157, 2012
132012
Investigation of a methane flare during the excavation of the Silvan irrigation tunnel, Turkey
M Ayhan, D Aydın, MŞ İmamoğlu, M Çoğalan, A Karakuş
Bulletin of Engineering Geology and the Environment 78, 2641-2652, 2019
122019
Yaz Spor Okulu Seçiminde Bütünleşik Bir Tereddütlü-Bulanık AHP ve TOPSIS Yaklaşımı.
MB Ayhan
Sakarya University Journal of Science (SAUJS)/Sakarya Üniversitesi Fen …, 2018
122018
An investigation of evaluation possibilities of muş-elmakaya lignite
M Ayhan, FD Ayhan, HA Temel
Energy sources, part A: recovery, utilization, and environmental effects 33 …, 2011
122011
Safety climate in marble industry and its influence on safety performance and occupational accidents
R Gümüş, M Ayhan, B Gümüş
Archives of Environmental & Occupational Health 78 (1), 48-59, 2023
112023
The system can't perform the operation now. Try again later.
Articles 1–20