Follow
Yavuz Gunalay
Yavuz Gunalay
Bahcesehir University
Verified email at bau.edu.tr
Title
Cited by
Cited by
Year
Robust optimization models for the discrete time/cost trade-off problem
Ö Hazır, E Erel, Y Günalay
International Journal of Production Economics 130 (1), 87-95, 2011
862011
Simulation-optimization techniques for modelling to generate alternatives in waste management planning
Y Gunalay, JS Yeomans
J. Appl. Oper. Res 3 (1), 23-35, 2011
482011
The relationship between preventive maintenance and manufacturing system performance
D Gupta, Y Günalay, MM Srinivasan
European Journal of Operational Research 132 (1), 146-162, 2001
472001
Carbon sequestration, optimum forest rotation and their environmental impact
E Kula, Y Gunalay
Environmental Impact Assessment Review 37, 18-22, 2012
462012
Modelling to generate alternative policies in highly uncertain environments: An application to municipal solid waste management planning.
Y Gunalay, JS Yeomans, GH Huang
Journal of Environmental Informatics 19 (2), 2012
462012
Customer order scheduling problem: a comparative metaheuristics study
Ö Hazır, Y Günalay, E Erel
The International Journal of Advanced Manufacturing Technology 37, 589-598, 2008
452008
Security personnel routing and rostering: a hyper-heuristic approach
M Misir, P Smet, K Verbeeck, G Vanden Berghe
Proceedings of the 3rd International Conference on Applied Operational …, 2011
402011
İstanbul ili afet lojistik planı kılavuzu
M Tanyaş, Y Günalay, L Aksoy, B Küçük
Lojistik Derneği, İstanbul, 2013
292013
Efficient management of production-inventory system in a multi-item manufacturing facility: MTS vs. MTO
Y Günalay
The International Journal of Advanced Manufacturing Technology 54, 1179-1186, 2011
292011
Stochastic analysis of finite population bufferless multiplexing in optical packet/burst switching systems
N Akar, Y Gunalay
IEICE transactions on communications 90 (2), 342-345, 2007
212007
Polling systems with a patient server and state-dependent setup times
Y Gunalay, D Gupta
IIE transactions 29 (6), 469-480, 1997
191997
Afet lojistik yönetiminde Rize iline yönelik yeni model önerisi
M Tanyaş, Y Günalay, L Aksoy, B Küçük
Bildiriler Kitabı 256, 2013, 2013
152013
Optimum cutting age for timber resources with carbon sequestration
Y Gunalay, E Kula
Resources Policy 37 (1), 90-92, 2012
112012
A decision support system for the university timetabling problem with instructor preferences
Y Günalay, T Sahin
Medwell Journals, 2006
102006
Comparative study of limited-range wavelength conversion policies for asynchronous optical packet switching
K Dogan, Y Gunalay, N Akar
Journal of Optical Networking 6 (2), 134-145, 2007
92007
Using simulation optimization techniques for water resources planning
JS Yeomans, Y Gunalay
Journal of Applied Operational Research 1 (1), 2-14, 2009
72009
İstanbul İlinde Olası Deprem Sonrası Lojistik Yönetimi Üzerine Bir Çalışma. II
M Tanyaş, Y Günalay, L Aksoy, B Küçük
Ulusal Lojistik ve Tedarik Zinciri Kongresi, Aksaray, 16-18, 2013
62013
Blockchain's potential for waste management in textile industry
E Dursun, Y Ulker, Y Gunalay
Management of Environmental Quality: An International Journal 34 (4), 1174-1197, 2023
52023
Dimensioning shared-per-node recirculating fiber delay line buffers in an optical packet switch
N Akar, Y Gunalay
Performance Evaluation 70 (12), 1059-1071, 2013
52013
İstanbul İli Afet Lojstik Planı Klavuzu
M Tanyaş, Y Günalay, L Aksoy, B Küçük
İSTANBUL: Lojistik Derneği-LODER, 2013
52013
The system can't perform the operation now. Try again later.
Articles 1–20