Optimal construction site layout based on risk spatial variability M Abune'Meh, R El Meouche, I Hijaze, A Mebarki, I Shahrour Automation in Construction 70, 167-177, 2016 | 49 | 2016 |
UAV photogrammetry implementation to enhance land surveying, comparisons and possibilities R El Meouche, I Hijazi, PA Poncet, M Abunemeh, M Rezoug The international archives of the photogrammetry, remote sensing and spatial …, 2016 | 44 | 2016 |
Indoor guided evacuation: TIN for graph generation and crowd evacuation M Xu, I Hijazi, A Mebarki, RE Meouche, M Abune'meh Geomatics, natural hazards and risk 7 (sup1), 47-56, 2016 | 41 | 2016 |
Developing optimal paths for evacuating risky construction sites R El Meouche, M Abunemeh, I Hijaze, A Mebarki, I Shahrour Journal of construction engineering and management 144 (2), 04017099, 2018 | 20 | 2018 |
Measuring the homogeneity of urban fabric using 2D geometry data I Hijazi, X Li, R Koenig, G Schmit, R El Meouche, Z Lv, M Abune’meh Environment and Planning B: Urban Analytics and City Science 44 (6), 1097-1121, 2017 | 16 | 2017 |
Mapping the processes of donor-funded construction projects I Hijazi, U Isikdag, M Abunemeh, X Li, M Hashash, R El Meouche, ... Sustainability 10 (7), 2355, 2018 | 9 | 2018 |
Multi-criteria decision making model for the selection of a construction contractor in Saudi Arabia MHAA Nemeh King Fahd University of Petroleum and Minerals (Saudi Arabia), 2012 | 8 | 2012 |
Probabilistic fire risk framework for optimizing construction site layout R El Meouche, M Abunemeh, I Hijazi, A Mebarki, F Fatayer, A Issa Sustainability 12 (10), 4065, 2020 | 7 | 2020 |
Hazards, vulnerability and interactions at construction sites: Spatial risk mapping M Abunemeh, I Hijaze, A Mebarki, I Shahrour Journal of Information Technology in Construction (ITcon) 22 (4), 63-79, 2017 | 6 | 2017 |
Investigating the causes preventing the fulfillment of construction contract requirements FA Fatayer, AZ Issa, M Abunemeh, MAM Dwikat Engineering, Construction and Architectural Management 29 (7), 2577-2598, 2022 | 4 | 2022 |
Construction Site Layout Optimization, Considering Risk of Natural or Technological Hazard Utilizing GIS M Abune'Meh Université Paris-Est, 2017 | 2 | 2017 |
Probabilistic Fire Risk Framework for Optimizing Construction Site Layout RE Meouche, M Abunemeh, I Hijazi, A Mebarki, F Fatayer, A Issa Sustainability 12 (10), 1-19, 2020 | | 2020 |
Optimisation de l’aménagement d’un Chantier de Construction en Fonction des Risques Naturels et Technologiques, Utilisation du SIG M Abune'meh Paris Est, 2017 | | 2017 |