Follow
Cemalettin Öztürk
Cemalettin Öztürk
Munster Technological University
Verified email at mtu.ie - Homepage
Title
Cited by
Cited by
Year
Empowering and engaging industrial workers with Operator 4.0 solutions
E Kaasinen, F Schmalfuß, C Özturk, S Aromaa, M Boubekeur, J Heilala, ...
Computers & Industrial Engineering 139, 105678, 2020
3092020
Object detection at 200 frames per second
R Mehta, C Ozturk
Proceedings of the European Conference on Computer Vision (ECCV) Workshops, 0-0, 2018
792018
Cyclic scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunali, B Hnich, A Ornek
Journal of Manufacturing Systems 36, 147-158, 2015
412015
Balancing and scheduling of flexible mixed model assembly lines
C Ozturk, S Tunali, B Hnich, MA Ornek
Constraints 18 (3), 434-469, 2013
402013
Balancing and scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunalı, B Hnich, A Örnek
The International Journal of Advanced Manufacturing Technology 67, 2577-2591, 2013
332013
Capacitated lot sizing with linked lots for general product structures in job shops
C Oztürk, AM Ornek
Computers & Industrial Engineering 58 (1), 151-164, 2010
312010
Operational extended model formulations for advanced planning and scheduling systems
C Öztürk, AM Ornek
Applied Mathematical Modelling 38 (1), 181-195, 2014
302014
Moreopt: A goal programming based movie recommender system
E Inan, F Tekbacak, C Ozturk
Journal of computational science 28, 43-50, 2018
272018
Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times
C Ozturk, S Tunali, B Hnich, AM Ornek
Electronic Notes in Discrete Mathematics 36, 65-72, 2010
272010
OPTIMISATION AND CONSTRAINT BASED HEURISTIC METHODS FOR ADVANCED PLANNING AND SCHEDULING SYSTEMS.
C Ozturk, MA Ornek
International Journal of Industrial Engineering 23 (1), 2016
232016
User evaluation of industry 4.0 concepts for worker engagement
S Aromaa, M Liinasuo, E Kaasinen, M Bojko, F Schmalfuß, ...
Human Systems Engineering and Design: Proceedings of the 1st International …, 2019
192019
Constraint-based robust planning and scheduling of airport apron operations through simheuristics
YS Gök, S Padrón, M Tomasella, D Guimarans, C Ozturk
Annals of Operations Research 320 (2), 795-830, 2023
172023
A MIP based heuristic for capacitated MRP systems
C Öztürk, AM Örnek
Computers & Industrial Engineering 63 (4), 926-942, 2012
172012
STTAR: a simheuristics-enabled scheme for multi-stakeholder coordination of aircraft turnaround operations
M Tomasella, A Clare, YS Gök, D Guimarans, C Ozturk
2019 Winter Simulation Conference (WSC), 488-499, 2019
162019
Integer and constraint programming model formulations for flight-gate assignment problem
MA Ornek, C Ozturk, I Sugut
Operational Research 22 (1), 135-163, 2022
142022
A note on A mixed integer programming model for advanced planning and scheduling (APS)
MA Örnek, S Özpeynirci, C Ozturk
European Journal of Operatıonal Research, 2010
142010
A simheuristic approach for robust scheduling of airport turnaround teams
YS Gök, M Tomasella, D Guimarans, C Ozturk
2020 Winter Simulation Conference (WSC), 1336-1347, 2020
132020
Robust resource planning for aircraft ground operations
YS Gök, D Guimarans, PJ Stuckey, M Tomasella, C Ozturk
Integration of Constraint Programming, Artificial Intelligence, and …, 2020
112020
Model-based heuristic for counter assignment problem with operational constrains: A case study
MA Ornek, C Ozturk, I Sugut
Journal of Air Transport Management 77, 57-64, 2019
82019
Simulation-based optimization tool for field service planning
GG Castańé, H Simonis, KN Brown, Y Lin, C Ozturk, M Garraffa, ...
2019 Winter Simulation Conference (WSC), 1684-1695, 2019
72019
The system can't perform the operation now. Try again later.
Articles 1–20