Follow
Pei-Yuan Hsu
Title
Cited by
Cited by
Year
Optimal logistics planning for modular construction using two-stage stochastic programming
PY Hsu, P Angeloudis, M Aurisicchio
Automation in construction 94, 47-61, 2018
1532018
Risk-averse supply chain for modular construction projects
PY Hsu, M Aurisicchio, P Angeloudis
Automation in Construction 106, 102898, 2019
832019
Applying building information modeling to integrate schedule and cost for establishing construction progress curves
KC Wang, WC Wang, HH Wang, PY Hsu, WH Wu, CJ Kung
Automation in construction 72, 397-410, 2016
822016
Investigating schedule deviation in construction projects through root cause analysis
PY Hsu, M Aurisicchio, P Angeloudis
Procedia Computer Science 121, 732-739, 2017
372017
Endogenous stochastic optimisation for relief distribution assisted with unmanned aerial vehicles
J Escribano Macias, N Goldbeck, PY Hsu, P Angeloudis, W Ochieng
Or Spectrum 42, 1089-1125, 2020
222020
Understanding and visualizing schedule deviations in construction projects using fault tree analysis
PY Hsu, M Aurisicchio, P Angeloudis, J Whyte
Engineering, Construction and Architectural Management 27 (9), 2501-2522, 2020
212020
Establishing outsourcing and supply chain plans for prefabricated construction projects under uncertain productivity
PY Hsu, M Aurisicchio, P Angeloudis
Computational Logistics: 8th International Conference, ICCL 2017 …, 2017
162017
Optimal logistics planning for modular construction using multi-stage stochastic programming
PY Hsu, M Aurisicchio, P Angeloudis
Transportation Research Procedia 46, 245-252, 2020
152020
On the selection of charging facility locations for EV-based ride-hailing services: A computational case study
E Anastasiadis, P Angeloudis, D Ainalis, Q Ye, PY Hsu, R Karamanis, ...
Sustainability 13 (1), 168, 2020
102020
Supply chain design for modular construction projects
PY Hsu, M Aurisicchio, P Angeloudis
25th Annual Conference of the International Group for Lean Construction …, 2017
82017
Establishing engineering S-curves to evaluate supervision engineer allocations for highway construction projects
SH Wang, WC Wang, PY Hsu, CH Chen, KC Wang
Journal of Civil Engineering and Management 22 (7), 890-902, 2016
72016
A bilevel optimisation model for the selection of parking and charging facilities for EV-based ride-hailing services
E Anastasiadis, P Angeloudis, D Ainalis, Q Ye, PY Hsu
12019
Establishing construction scheduling progress curve based on buidling information modeling quantity takeoffs
KC Wang, WH Wu, PY Hsu, AA Gansonre, WC Wang, CJ Kung
2015 10th International Joint Conference on Software Technologies (ICSOFT) 1 …, 2015
2015
The system can't perform the operation now. Try again later.
Articles 1–13