Multi-item spare parts systems with lateral transshipments and waiting time constraints H Wong, GJ van Houtum, D Cattrysse, D Van Oudheusden European Journal of Operational Research 171 (3), 1071-1093, 2006 | 222 | 2006 |
Stocking decisions for repairable spare parts pooling in a multi-hub system H Wong, D Cattrysse, D Van Oudheusden International journal of production economics 93, 309-317, 2005 | 113 | 2005 |
Cost allocation in spare parts inventory pooling H Wong, D Van Oudheusden, D Cattrysse Transportation Research Part E: Logistics and Transportation Review 43 (4 …, 2007 | 102 | 2007 |
Simple, efficient heuristics for multi-item multi-location spare parts systems with lateral transshipments and waiting time constraints H Wong, GJ van Houtum, D Cattrysse, D Van Oudheusden Journal of the Operational Research Society 56 (12), 1419-1430, 2005 | 101 | 2005 |
Evaluation of postponement in the soluble coffee supply chain: A case study H Wong, A Potter, M Naim International Journal of Production Economics 131 (1), 355-364, 2011 | 82 | 2011 |
Inventory pooling of repairable spare parts with non-zero lateral transshipment time and delayed lateral transshipments H Wong, D Cattrysse, D Van Oudheusden European Journal of Operational Research 165 (1), 207-218, 2005 | 78 | 2005 |
Efficient heuristics for two-echelon spare parts inventory systems with an aggregate mean waiting time constraint per local warehouse H Wong, B Kranenburg, GJ van Houtum, D Cattrysse OR spectrum 29 (4), 699-722, 2007 | 70 | 2007 |
Analysis of form postponement based on optimal positioning of the differentiation point and stocking decisions H Wong, J Wikner, M Naim International Journal of Production Research 47 (5), 1201-1224, 2009 | 51 | 2009 |
An analytical framework for evaluating the value of enhanced customisation: An integrated operations-marketing perspective H Wong, D Eyers International Journal of Production Research 49 (19), 5779-5800, 2011 | 28 | 2011 |
On the evaluation of product customization strategies in a vertically differentiated market H Wong, D Lesmono International Journal of Production Economics 144 (1), 105-117, 2013 | 27 | 2013 |
The effects of resupply flexibility on the design of service parts supply systems F Van Utterbeeck, H Wong, D Van Oudheusden, D Cattrysse Transportation Research Part E: Logistics and Transportation Review 45 (1 …, 2009 | 25 | 2009 |
Two-echelon multi-item spare parts systems with emergency supply flexibility and waiting time constraints H Wong, DV Oudheusden, D Cattrysse IIE Transactions 39 (11), 1045-1057, 2007 | 20 | 2007 |
Multi-echelon inventory optimal model of civil aircraft spare parts L Sun, H Zuo 2010 Chinese Control and Decision Conference, 824-828, 2010 | 17 | 2010 |
Postponement based on the positioning of the differentiation and decoupling points J Wikner, H Wong Advances in Production Management Systems, 143-150, 2007 | 15 | 2007 |
Enhancing responsiveness for mass customization strategies through the use of rapid manufacturing technologies H Wong, D Eyers Innovative Quick Response Programs in Logistics and Supply Chain Management …, 2010 | 14 | 2010 |
Prediction model for allocation efficiency of support equipment in products developing phase R Liu, R Kang, ZY Zhang, ZD Huang Systems Engineering and Electronics 33 (5), 1040-1044, 2011 | 10 | 2011 |
Pooling of repairable spare parts: A study on inventory policies HW Wong 4OR 3 (3), 253-256, 2005 | 10 | 2005 |
Evaluation of postponement in manufacturing systems with non-negligible changeover times H Wong, J Wikner, M Naim Production Planning & Control 21 (3), 258-273, 2010 | 9 | 2010 |
Integration of promotion and production decisions in sales and operations planning A Darmawan, H Wong, A Thorstenson International Journal of Production Research, 2018 | 8 | 2018 |
Rapid manufactured enabled mass customisation: untapped research opportunities in supply chain management DR Eyers, H Wong, Y Wang, K Dotchev | 5 | 2008 |