Mathematical modeling and heuristic approaches to flexible job shop scheduling problems P Fattahi, M Saidi Mehrabad, F Jolai Journal of intelligent manufacturing 18, 331-342, 2007 | 541 | 2007 |
Flexible job shop scheduling with tabu search algorithms M Saidi-Mehrabad, P Fattahi The international journal of Advanced Manufacturing technology 32, 563-570, 2007 | 300 | 2007 |
An Ant Colony Algorithm (ACA) for solving the new integrated model of job shop scheduling and conflict-free routing of AGVs M Saidi-Mehrabad, S Dehnavi-Arani, F Evazabadian, V Mahmoodian Computers & Industrial Engineering 86, 2-13, 2015 | 244 | 2015 |
RETRACTED ARTICLE: Methodologies to Optimize Automated Guided Vehicle Scheduling and Routing Problems: A Review Study H Fazlollahtabar, M Saidi-Mehrabad Journal of Intelligent & Robotic Systems 77 (3), 525-545, 2015 | 234 | 2015 |
A hybrid simulated annealing for solving an extended model of dynamic cellular manufacturing system N Safaei, M Saidi-Mehrabad, MS Jabal-Ameli European Journal of Operational Research 185 (2), 563-592, 2008 | 220 | 2008 |
Modelling different types of uncertainty in biofuel supply network design and planning: A robust optimization approach S Bairamzadeh, M Saidi-Mehrabad, MS Pishvaee Renewable energy 116, 500-517, 2018 | 201 | 2018 |
Multiobjective robust possibilistic programming approach to sustainable bioethanol supply chain design under multiple uncertainties S Bairamzadeh, MS Pishvaee, M Saidi-Mehrabad Industrial & Engineering Chemistry Research 55 (1), 237-256, 2016 | 150 | 2016 |
The development of an expert system for effective selection and appointment of the jobs applicants in human resource management MS Mehrabad, MF Brojeny Computers & Industrial Engineering 53 (2), 306-312, 2007 | 142 | 2007 |
A hybrid genetic-variable neighborhood search algorithm for the cell formation problem based on grouping efficacy MM Paydar, M Saidi-Mehrabad Computers & Operations Research 40 (4), 980-990, 2013 | 114 | 2013 |
A stochastic programming approach toward optimal design and planning of an integrated green biodiesel supply chain network under uncertainty: A case study Z Ghelichi, M Saidi-Mehrabad, MS Pishvaee Energy 156, 661-687, 2018 | 109 | 2018 |
A new model of dynamic cell formation by a neural approach M Saidi-Mehrabad, N Safaei The International Journal of Advanced Manufacturing Technology 33, 1001-1009, 2007 | 100 | 2007 |
A fuzzy programming approach for a cell formation problem with dynamic and uncertain conditions N Safaei, M Saidi-Mehrabad, R Tavakkoli-Moghaddam, F Sassani Fuzzy Sets and Systems 159 (2), 215-236, 2008 | 95 | 2008 |
Mathematical optimization for earliness/tardiness minimization in a multiple automated guided vehicle manufacturing system via integrated heuristic algorithms H Fazlollahtabar, M Saidi-Mehrabad, J Balakrishnan Robotics and Autonomous Systems 72, 131-138, 2015 | 93 | 2015 |
An efficient hybrid self-learning method for stochastic cellular manufacturing problem: A queuing-based analysis VR Ghezavati, M Saidi-Mehrabad Expert Systems with Applications 38 (3), 1326-1335, 2011 | 77 | 2011 |
Revised multi-choice goal programming for integrated supply chain design and dynamic virtual cell formation with fuzzy parameters MM Paydar, M Saidi-Mehrabad International Journal of Computer Integrated Manufacturing 28 (3), 251-265, 2015 | 75 | 2015 |
An extended discrete particle swarm optimization algorithm for the dynamic facility layout problem H Rezazadeh, M Ghazanfari, M Saidi-Mehrabad, S Jafar Sadjadi Journal of Zhejiang University-Science A 10, 520-529, 2009 | 73 | 2009 |
MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints R Ramezanian, M Saidi-Mehrabad, P Fattahi Journal of Manufacturing Systems 32 (2), 392-401, 2013 | 69 | 2013 |
Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system R Ramezanian, M Saidi-Mehrabad Applied Mathematical Modelling 37 (7), 5134-5147, 2013 | 66 | 2013 |
A production and distribution planning of perishable products with a fixed lifetime under vertical competition in the seller-buyer systems: A real-world application A Aazami, M Saidi-Mehrabad Journal of manufacturing systems 58, 223-247, 2021 | 64 | 2021 |
Autonomous guided vehicles H Fazlollahtabar, M Saidi-Mehrabad Studies in Systems, Decision and Control 20, 2015 | 64 | 2015 |