Peter Almström
Peter Almström
Associate Professor at Technology Management and Economics, Chalmers University of Technology
Verified email at chalmers.se
TitleCited byYear
The productivity potential assessment method: Assessing and benchmarking the improvement potential in manufacturing systems at shop-floor level
P Almström, A Kinnander
International Journal of Productivity and Performance Management 60 (7), 758-770, 2011
442011
Sustainable production indicators at factory level
M Winroth, P Almström, C Andersson
Journal of Manufacturing Technology Management 27 (6), 842-873, 2016
262016
Productivity potential assessment of the Swedish manufacturing industry
P Almström, A Kinnander
Proceedings from the 1st Swedish Production Symposium, 2007
202007
Analysis of critical factors for automatic measurement of OEE
R Hedman, M Subramaniyan, P Almström
Procedia CIRP 57, 128-133, 2016
192016
Results and conclusions from the productivity potential assessment studies
P Almström, A Kinnander
Proceedings of the 2nd Swedish Production Symposium, 2008
172008
A model for linking shop floor improvements to manufacturing cost and profitability
R Sundkvist, R Hedman, P Almström
International Journal of Computer Integrated Manufacturing 25 (4-5), 315-325, 2012
142012
Sustainable indicators at factory level-a framework for practical assessment
M Winroth, P Almström, C Andersson
IIE Annual Conference. Proceedings, 1, 2012
132012
The productivity potential assessment method
P Almström, A Kinnander
International Journal of Productivity and Performance Management, 2011
122011
Why is there a mismatch between operation times in the planning systems and the times in reality
P Almström, M Winroth
Proceedings of the International conference on Advances in Production …, 2010
122010
Development of Manufacturing Systems-A Methodology Based on Systems Engineering and Design Theory
P Almström
Chalmers University of Technology, 2005
112005
Systematic Design and Analysis of Manufacturing Systems-Industrial Experiences
P Almstrom
Proceedings of the 14th International Conference on CAD/CAM, Robotics and …, 1998
101998
Object-oriented modeling of manufacturing resources using work study inputs
R Hedman, R Sundkvist, P Almström, A Kinnander
Procedia CIRP 7, 443-448, 2013
92013
PPA-en metod för att bedöma produktivitetspotentialen i verkstadsindustrin
P Almström, A Kinnander
External organization, 2006
82006
Sustainability performance indicators at shop floor level in large manufacturing companies
M Zackrisson, M Kurdve, S Shahbazi, M Wiktorsson, M Winroth, ...
Procedia CIRP 61, 457-462, 2017
72017
Improvement potentials in Swedish electronics manufacturing industry–Analysis of five case studies
R Sundkvist, R Hedman, P Almström, A Kinnander
Procedia CIRP 3, 126-131, 2012
62012
PPA-metoden-En metod för att bedöma produktivitetspotentialen i verkstadsindustrin
P Almström, A Kinnander
Nutek rapport 2006, 2006
62006
Att mäta produktivitetspotentialen
A Kinnander, P Almström
NUTEK, Stockholm, 2006
62006
A state of the art system for managing time data in manual assembly
R Hedman, P Almström
International Journal of Computer Integrated Manufacturing 30 (10), 1060-1071, 2017
52017
Present state analysis of business performance measurement systems in large manufacturing companies
A Landström, P Almström, M Winroth, C Andersson, C Windmark, ...
Proceedings of the 10th Conference of the Performance Measurement …, 2016
52016
Performance and utilization factors for manual and semi-automated work
P Almström
In the proceedings of the EurOMA 2013 conference, Dublin, 2013
52013
The system can't perform the operation now. Try again later.
Articles 1–20