Giorgos Kopanos
Giorgos Kopanos
Senior Scientist at Flexciton Ltd, London, United Kingdom
Verified email at flexciton.com - Homepage
TitleCited byYear
Energy production planning of a network of micro combined heat and power generators
GM Kopanos, MC Georgiadis, EN Pistikopoulos
Applied Energy 102, 1522-1534, 2013
1182013
A rolling horizon optimization framework for the simultaneous energy supply and demand planning in microgrids
J Silvente, GM Kopanos, EN Pistikopoulos, A Espuña
Applied Energy 155, 485-501, 2015
862015
A spatial multi-period long-term energy planning model: a case study of the Greek power system
NE Koltsaklis, AS Dagoumas, GM Kopanos, EN Pistikopoulos, ...
Applied Energy 115, 456-482, 2014
852014
Simultaneous production and logistics operations planning in semicontinuous food industries
GM Kopanos, L Puigjaner, MC Georgiadis
Omega 40 (5), 634-650, 2012
782012
Reactive scheduling by a multiparametric programming rolling horizon framework: a case of a network of combined heat and power units
GM Kopanos, EN Pistikopoulos
Industrial & Engineering Chemistry Research 53 (11), 4366-4386, 2014
682014
Optimal production scheduling and lot-sizing in dairy plants: the yogurt production line
GM Kopanos, L Puigjaner, MC Georgiadis
Industrial & Engineering Chemistry Research 49 (2), 701-718, 2009
622009
Flexible design‐planning of supply chain networks
JM Laínez, G Kopanos, A Espuña, L Puigjaner
AIChE Journal 55 (7), 1736-1753, 2009
622009
MIP-based decomposition strategies for large-scale scheduling problems in multiproduct multistage batch plants: A benchmark scheduling problem of the pharmaceutical industry
GM Kopanos, CA Méndez, L Puigjaner
European journal of operational research 207 (2), 644-655, 2010
602010
Production planning and scheduling of parallel continuous processes with product families
GM Kopanos, L Puigjaner, CT Maravelias
Industrial & engineering chemistry research 50 (3), 1369-1378, 2010
572010
MILP formulations for single-and multi-mode resource-constrained project scheduling problems
TS Kyriakidis, GM Kopanos, MC Georgiadis
Computers & chemical engineering 36, 369-385, 2012
492012
An efficient mixed-integer linear programming scheduling framework for addressing sequence-dependent setup issues in batch plants
GM Kopanos, JM Laínez, L Puigjaner
Industrial & Engineering Chemistry Research 48 (13), 6346-6357, 2009
422009
New continuous-time and discrete-time mathematical formulations for resource-constrained project scheduling problems
GM Kopanos, TS Kyriakidis, MC Georgiadis
Computers & Chemical Engineering 68, 96-106, 2014
372014
Resource-constrained production planning in semicontinuous food industries
GM Kopanos, L Puigjaner, MC Georgiadis
Computers & chemical engineering 35 (12), 2929-2944, 2011
362011
Efficient mathematical frameworks for detailed production scheduling in food processing industries
GM Kopanos, L Puigjaner, MC Georgiadis
Computers & Chemical Engineering 42, 206-216, 2012
352012
Optimization of a network of compressors in parallel: Real Time Optimization (RTO) of compressors in chemical plants–An industrial case study
DP Xenos, M Cicciotti, GM Kopanos, AEF Bouaswaig, O Kahrs, ...
Applied Energy 144, 51-63, 2015
312015
Costs for rescheduling actions: a critical issue for reducing the gap between scheduling theory and practice
GM Kopanos, E Capón-García, A Espuna, L Puigjaner
Industrial & Engineering Chemistry Research 47 (22), 8785-8795, 2008
312008
Production scheduling in multiproduct multistage semicontinuous food processes
GM Kopanos, L Puigjaner, MC Georgiadis
Industrial & Engineering Chemistry Research 50 (10), 6316-6324, 2011
302011
Optimization of a network of compressors in parallel: Operational and maintenance planning–The air separation plant case
GM Kopanos, DP Xenos, M Cicciotti, EN Pistikopoulos, NF Thornhill
Applied energy 146, 453-470, 2015
222015
Operational optimization of networks of compressors considering condition-based maintenance
DP Xenos, GM Kopanos, M Cicciotti, NF Thornhill
Computers & Chemical Engineering 84, 117-131, 2016
182016
Design and operational planning of energy networks based on combined heat and power units
NE Koltsaklis, GM Kopanos, MC Georgiadis
Industrial & Engineering Chemistry Research 53 (44), 16905-16923, 2014
172014
The system can't perform the operation now. Try again later.
Articles 1–20