÷ncŁ Hazır
÷ncŁ Hazır
Rennes School of Business
Verified email at rennes-sb.com - Homepage
Title
Cited by
Cited by
Year
A review of analytical models, approaches and decision support tools in project monitoring and control
÷ Hazır
International Journal of Project Management 33 (4), 808-815, 2015
1202015
Robust scheduling and robustness measures for the discrete time/cost trade-off problem
÷ Hazır, M Haouari, E Erel
European Journal of Operational Research 207 (2), 633-643, 2010
1102010
Assembly line balancing under uncertainty: Robust optimization models and exact solution method
÷N HazıR, A Dolgui
Computers & Industrial Engineering 65 (2), 261-267, 2013
732013
Discrete time/cost trade-off problem: A decomposition-based solution algorithm for the budget version
÷ Hazır, M Haouari, E Erel
Computers & Operations Research 37 (4), 649-655, 2010
612010
Robust optimization models for the discrete time/cost trade-off problem
÷ Hazır, E Erel, Y GŁnalay
International Journal of Production Economics 130 (1), 87-95, 2011
502011
Robust balancing of straight assembly lines with interval task times
E Gurevsky, ÷ Hazır, O BattaÔa, A Dolgui
Journal of the Operational Research Society 64 (11), 1607-1613, 2013
452013
A decomposition based solution algorithm for U-type assembly line balancing with interval data
÷ Hazır, A Dolgui
Computers & Operations Research 59, 126-131, 2015
422015
Customer order scheduling problem: a comparative metaheuristics study
÷ Hazır, Y GŁnalay, E Erel
The International Journal of Advanced Manufacturing Technology 37 (5-6), 589-598, 2008
342008
A review of cost and profit oriented line design and balancing problems and solution approaches
÷ Hazır, X Delorme, A Dolgui
Annual Reviews in Control 40, 14-24, 2015
222015
Single item lot-sizing problem for a warm/cold process with immediate lost sales
E Berk, A÷ Toy, ÷ Hazır
European Journal of Operational Research 187 (3), 1251-1267, 2008
212008
An integrated scheduling and control model for multi-mode projects
÷ Hazır, KW Schmidt
Flexible Services and Manufacturing Journal 25 (1-2), 230-254, 2013
172013
Integrated batch sizing and scheduling on a single machine
P Chrťtienne, ÷ Hazır, S Kedad-Sidhoum
Journal of Scheduling 14 (6), 541-555, 2011
152011
Batch sizing and just-in-time scheduling with common due date
÷ Hazır, S Kedad-Sidhoum
Annals of Operations Research 213 (1), 187-202, 2014
142014
Effects of the information presentation format on project control
÷ Hazır, A Shtub
Journal of the Operational Research Society 62 (12), 2157-2161, 2011
132011
A survey on cost and profit oriented assembly line balancing
÷ Hazır, X Delorme, A Dolgui
IFAC Proceedings Volumes 47 (3), 6159-6167, 2014
112014
Robust assembly line balancing: state of the art and new research perspectives
O Hazır, A Dolgui
Sequencing and Scheduling with Inaccurate Data, 211-223, 2014
62014
Robust optimization for the discrete time-cost tradeoff problem with cost uncertainty
÷ Hazır, M Haouari, E Erel
Handbook on Project Management and Scheduling Vol. 2, 865-874, 2015
52015
An exact solution algorithm for balancing simple U-type assembly
÷ Hazır, A Dolgui
32011
Simple assembly line balancing under uncertainty: A robust approach
÷ Hazir, A Dolgui
International Conference on Production Research (ICPR 21): Innovation in†…, 2011
32011
Robustness measures and a scheduling algorithm for discrete time/cost tradeoff problem
÷ Hazır, E Erel, M Haouari
PMS 2008, 119, 2008
32008
The system can't perform the operation now. Try again later.
Articles 1–20