Priyanka Verma
Title
Cited by
Cited by
Year
Assessment of pre and post-disaster supply chain resilience based on network structural parameters with CVaR as a risk measure
V Dixit, P Verma, MK Tiwari
International Journal of Production Economics, 107655, 2020
542020
Supplier evaluation for resilient project driven supply chain
A Shishodia, P Verma, V Dixit
Computers & Industrial Engineering 129, 465-478, 2019
252019
Project risk analysis based on project characteristics
A Shishodia, V Dixit, P Verma
Benchmarking: An International Journal, 2018
182018
Assessing manufacturing strategy definitions utilising text-mining
S Kulkarni, P Verma, R Mukundan
International Journal of Production Research, 1-28, 2018
172018
Supply chain risk mitigation strategies during COVID-19: exploratory cases of “make-to-order” handloom saree apparel industries
V Dohale, P Ambilkar, A Gunasekaran, P Verma
International Journal of Physical Distribution & Logistics Management, 2021
112021
Extending Canvas of Manufacturing Strategy: 8Ps Model
S Kulkarni, P Verma, R Mukundan
International Journal of Global Business and Competitiveness 11 (1), 7-21, 2016
102016
Vertical Decomposition Approach to Solve Single Stage Capacitated Warehouse Location Problem (SSCWLP)
P Verma, RRK Sharma
American Journal of Operations Research 1 (03), 100, 2011
102011
Twenty-five years’ contribution of “Benchmarking: an International Journal” to manufacturing strategy: a scientometric review
V Dohale, A Gunasekaran, MM Akarte, P Verma
Benchmarking: An International Journal, 2020
92020
Performance landscape modeling in digital manufacturing firm
S Kulkarni, P Verma, R Mukundan
Business Process Management Journal, 2019
72019
Leveraging tacit knowledge for shipyard facility layout selection using fuzzy set theory
V Dixit, P Verma, P Raj
Expert Systems with Applications, 113423, 2020
52020
Vertical decomposition approach to solve single stage capacitated warehouse location problems
P Verma, RRK Sharma
Industrial Engineering and Engineering Management, 2007 IEEE International …, 2007
42007
Supplier resilience assessment in project-driven supply chains
A Shishodia, P Verma, K Jain
Production Planning & Control, 1-19, 2020
22020
Determining the Process Choice Criteria for Selecting a Production System in a Manufacturing Firm Using a Delphi Technique
VD Dohale, MM Akarte, P Verma
2019 IEEE International Conference on Industrial Engineering and Engineering …, 2020
22020
Resource and time criticality based block spatial scheduling in a shipyard under uncertainty
V Dixit, P Verma, P Raj, M Sharma
International Journal of Production Research, 2018
22018
Hybrid Formulations of Single Stage Uncapacitated Warehouse Location Problem: Theoretical Framework and Empirical Results
RRK Sharma, P Verma
International Journal of Operations and Quantitative Management 18 (1), 53-69, 2012
2*2012
COVID-19 and supply chain risk mitigation: a case study from India
V Dohale, P Verma, A Gunasekaran, P Ambilkar
The International Journal of Logistics Management, 2021
12021
52 Years of manufacturing strategy: an evolutionary review of literature (1969–2021)
V Dohale, A Gunasekaran, MM Akarte, P Verma
International Journal of Production Research, 1-26, 2021
12021
An Integrated Delphi-MCDM-Bayesian Network Framework for Production System Selection
V Dohale, A Gunasekaran, M Akarte, P Verma
International Journal of Production Economics, 108296, 2021
12021
Unpacking the Role of Primary Packaging Material in Designing Green Supply Chains: An Integrated Approach
AN Tanksale, D Das, P Verma, MK Tiwari
International Journal of Production Economics, 108133, 2021
12021
Risk and Resilience Analysis for Industry 4.0 in Achieving the Goals of Smart Logistics: An Overview
P Verma, V Dixit, J Kushwaha
International Conference on Industrial Engineering and Operations Management …, 2020
12020
The system can't perform the operation now. Try again later.
Articles 1–20