Follow
Ana Roxana Ciupuliga
Ana Roxana Ciupuliga
Verified email at tudelft.nl
Title
Cited by
Cited by
Year
The role of dialogue in fostering acceptance of transmission lines: the case of a France–Spain interconnection project
AR Ciupuliga, E Cuppen
Energy Policy 60, 224-233, 2013
1062013
Round-the-year security analysis with large-scale wind power integration
AR Ciupuliga, M Gibescu, E Pelgrum, PGH Jacobs, KPJ Jansen, WL Kling
IEEE Transactions on Sustainable Energy 3 (1), 85-93, 2011
262011
Fault ride-through requirements for onshore wind power plants in Europe: The needs of the power system
JC Boemer, AA van der Meer, BG Rawn, RL Hendriks, AR Ciupuliga, ...
2011 IEEE Power and Energy Society General Meeting, 1-8, 2011
192011
Possible criteria to assess technical-economic and strategic benefits of specific transmission projects
A L’Abbate, I Losa, G Migliavacca, AR Ciupuliga, M Gibescu, H Auer, ...
REALISEGRID Deliverable D 3, 2011
182011
Grid connection of large wind power plants. A European overview
AR Ciupuliga, M Gibescu, WL Kling, G Fulli, A L'Abbate
172009
Review of existing methods for transmission planning and for grid connection of wind power plants
G Fulli, AR Ciupuliga, A L’Abbate, M Gibescu
REALISEGRID Deliverable D 3, 2009
132009
Transmission expansion planning under increased uncertainties, towards efficient and sustainable power systems
AR Ciupuliga
122013
A market-based investigation of large-scale renewable energy integration in northwestern europe
AR Ciupuliga, M Gibescu, E Pelgrum, MAMM van der Meijden, WL Kling
2012 IEEE Power and Energy Society General Meeting, 1-8, 2012
102012
Combining market simulations and load-flow calculations for planning of interconnected systems with high RES penetration-Practical experience
PGH Jacobs, CPJ Jansen, R Van Houtert, E Pelgrum, AR Ciupuliga, ...
44th International Conference on Large High Voltage Electric Systems 2012 …, 2012
82012
Prospects for the transmission planning in Europe towards a sustainable energy future: the REALISEGRID project
G Migliavacca, A L’Abbate, I Losa, S Galant, A Vaféas, T Pagano, G Fulli, ...
Proc. of CIGRE 2010 Session, Paris, France, 2010
82010
A novel transmission system planning method combining market simulations and load flow calculations for identifying bottlenecks in systems with large RES penetration
PGH Jacobs, CPJ Jansen, R Van Offeren, E Pelgrum, AR Ciupuliga, ...
Proc. Cigré, 22-27, 2010
82010
Approval procedures and consensus for building transmission lines: obstacles and solutions
AR Ciupuliga, M Gibescu, W Kling, G Migliavacca, A L'Abbate, K Jansen, ...
2011 8th International Conference on the European Energy Market (EEM), 426-431, 2011
52011
Round-the-year based network reinforcement solution generator
AR Ciupuliga, M Gibescu, WL Kling, M van der Meijden
2014 Power Systems Computation Conference, 1-7, 2014
42014
Round-the-year security analysis with bottleneck ranking for interconnected power systems with large-scale wind power
AR Ciupuliga, M Gibescu, E Pelgrum, PGH Jacobs, CPJ Jansen, ...
2010 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT …, 2010
42010
Review of existing transmission planning and approval procedures and coordination of infrastructure developments between TSOs
AR Ciupuliga, M Gibescu
Realise Grid project deliverable D 3, 2010
42010
The impacts of extra load from EVs in the Netherlands: A North-West Europe case study
A Lojowska, AR Ciupuliga, G Papaefthymiou, L van der Sluis
2012 IEEE International Electric Vehicle Conference, 1-7, 2012
32012
REALISEGRID D3. 1.1 Review of existing methods for transmission planning and for grid connection of wind power plants
G Fulli, AR Ciupuliga, A L’Abbate, M Gibescu
June, 2009
32009
Evaluation of north sea offshore grid topologies via market simulations and security analysis
AR Ciupuliga, M Gibescu, M van der Meijden, WL Kling
IET Digital Library, 2014
12014
Sustainability assessment of transmission expansion alternatives
AR Ciupuliga, M Gibescu, E Pelgrum, WL Kling
Conf. Proc. of 17th Power Systems Computation Conference, 2011
12011
North Sea Transnational Grid
FDJ Nieuwenhout, EJ Wiggelinkhuizen, P Bauer, A van der Meer, ...
ECN, 2014
2014
The system can't perform the operation now. Try again later.
Articles 1–20