Stock replenishment and shipment scheduling for vendor-managed inventory systems S Cetinkaya, CY Lee Management Science 46 (2), 217-232, 2000 | 927 | 2000 |
A review of production planning and scheduling models in the semiconductor industry part I: system characteristics, performance evaluation and production planning R Uzsoy, CY Lee, LA Martin-Vega IIE transactions 24 (4), 47-60, 1992 | 862 | 1992 |
Scheduling precedence graphs in systems with interprocessor communication times JJ Hwang, YC Chow, FD Anger, CY Lee siam journal on computing 18 (2), 244-257, 1989 | 861 | 1989 |
Efficient algorithms for scheduling semiconductor burn-in operations CY Lee, R Uzsoy, LA Martin-Vega Operations Research 40 (4), 764-775, 1992 | 608 | 1992 |
A review of production planning and scheduling models in the semiconductor industry part II: Shop-floor control R Uzsoy, CY Lee, LA Martin-Vega IIE transactions 26 (5), 44-55, 1994 | 567 | 1994 |
Business process management: survey and methodology DJ Elzinga, T Horak, CY Lee, C Bruner IEEE transactions on engineering management 42 (2), 119-128, 1995 | 556 | 1995 |
Machine scheduling with an availability constraint CY Lee Journal of global optimization 9 (3), 395-416, 1996 | 535 | 1996 |
Machine scheduling with transportation considerations CY Lee, ZL Chen Journal of scheduling 4 (1), 3-24, 2001 | 440 | 2001 |
Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem CY Lee, TCE Cheng, BMT Lin Management Science 39 (5), 616-625, 1993 | 432 | 1993 |
Ocean container transport in global supply chains: Overview and research opportunities CY Lee, DP Song Transportation Research Part B: Methodological 95, 442-474, 2017 | 366 | 2017 |
Minimizing makespan on a single batch processing machine with dynamic job arrivals CY Lee International journal of production research 37 (1), 219-236, 1999 | 334 | 1999 |
Current trends in deterministic scheduling CY Lee, L Lei, M Pinedo Annals of operations Research 70 (0), 1-41, 1997 | 328 | 1997 |
Machine scheduling with job delivery coordination YC Chang, CY Lee European Journal of Operational Research 158 (2), 470-487, 2004 | 327 | 2004 |
Scheduling jobs and maintenance activities on parallel machines CY Lee, ZL Chen Naval Research Logistics (NRL) 47 (2), 145-165, 2000 | 311 | 2000 |
Minimizing total completion time on batch processing machines V Chandru, CY Lee, R Uzsoy The International Journal Of Production Research 31 (9), 2097-2121, 1993 | 286 | 1993 |
Parallel machines scheduling with nonsimultaneous machine available time CY Lee Discrete Applied Mathematics 30 (1), 53-61, 1991 | 269 | 1991 |
Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint CY Lee Operations research letters 20 (3), 129-139, 1997 | 267 | 1997 |
The critical role of ocean container transport in global supply chain performance JC Fransoo, CY Lee Production and Operations Management 22 (2), 253-268, 2013 | 258 | 2013 |
Minimizing the makespan in a two-machine cross-docking flow shop problem F Chen, CY Lee European Journal of Operational Research 193 (1), 59-72, 2009 | 256 | 2009 |
Single machine flow-time scheduling with scheduled maintenance CY Lee, SD Liman Acta Informatica 29, 375-382, 1992 | 250 | 1992 |