Jose Pinto
Jose Pinto
Verified email at praxair.com
Title
Cited by
Cited by
Year
Mixed-integer linear programming model for refinery short-term scheduling of crude oil unloading with inventory management
H Lee, JM Pinto, IE Grossmann, S Park
Industrial & Engineering Chemistry Research 35 (5), 1630-1641, 1996
4331996
Planning and scheduling models for refinery operations
JM Pinto, M Joly, LFL Moro
Computers & Chemical Engineering 24 (9-10), 2259-2276, 2000
4292000
A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants
JM Pinto, IE Grossmann
Industrial & Engineering Chemistry Research 34 (9), 3037-3051, 1995
3721995
OPTI: Lowering the barrier between open source optimizers and the industrial MATLAB user
J Currie, DI Wilson, N Sahinidis, J Pinto
Foundations of computer-aided process operations 24, 32, 2012
3702012
A general modeling framework for the operational planning of petroleum supply chains
SMS Neiro, JM Pinto
Computers & Chemical Engineering 28 (6-7), 871-896, 2004
3202004
Optimal production planning under time-sensitive electricity prices for continuous power-intensive processes
S Mitra, IE Grossmann, JM Pinto, N Arora
Computers & Chemical Engineering 38, 171-184, 2012
2552012
Assignment and sequencing models for thescheduling of process systems
JM Pinto, IE Grossmann
Annals of Operations Research 81, 433-466, 1998
2341998
Scheduling of a multiproduct pipeline system
R Rejowski Jr, JM Pinto
Computers & Chemical Engineering 27 (8-9), 1229-1246, 2003
2162003
Optimal cyclic scheduling of multistage continuous multiproduct plants
JM Pinto, IE Grossmann
Computers & Chemical Engineering 18 (9), 797-816, 1994
1801994
Modeling of plate heat exchangers with generalized configurations
JAW Gut, JM Pinto
International journal of heat and mass transfer 46 (14), 2571-2585, 2003
1692003
A novel continuous time representation for the scheduling of pipeline systems with pumping yield rate constraints
R Rejowski Jr, JM Pinto
Computers & Chemical Engineering 32 (4-5), 1042-1066, 2008
1512008
Optimal configuration design for plate heat exchangers
JAW Gut, JM Pinto
International Journal of Heat and Mass Transfer 47 (22), 4833-4848, 2004
1382004
Mixed-integer programming approach for short-term crude oil scheduling
LFL Moro, JM Pinto
Industrial & engineering chemistry research 43 (1), 85-94, 2004
1292004
A planning model for refinery diesel production
LFL Moro, AC Zanin, JM Pinto
Computers & Chemical Engineering 22, S1039-S1042, 1998
1291998
Efficient MILP formulations and valid cuts for multiproduct pipeline scheduling
R Rejowski Jr, JM Pinto
Computers & Chemical Engineering 28 (8), 1511-1528, 2004
1282004
Air separation with cryogenic energy storage: optimal scheduling considering electric energy and reserve markets
Q Zhang, IE Grossmann, CF Heuberger, A Sundaramoorthy, JM Pinto
AIChE Journal 61 (5), 1547-1558, 2015
1212015
Planning and scheduling for petroleum refineries using mathematical programming
M Joly, LFL Moro, JM Pinto
Brazilian Journal of Chemical Engineering 19 (2), 207-228, 2002
1082002
Thermal model validation of plate heat exchangers with generalized configurations
JAW Gut, R Fernandes, JM Pinto, CC Tadini
Chemical Engineering Science 59 (21), 4591-4600, 2004
992004
A mechanistic kinetic model for phenol degradation by the Fenton process
RFF Pontes, JEF Moraes, A Machulek Jr, JM Pinto
Journal of hazardous materials 176 (1-3), 402-413, 2010
962010
Multiperiod optimization for production planning of petroleum refineries
SMS Neiro, JM Pinto
Chem. Eng. Comm. 192 (1), 62-88, 2005
862005
The system can't perform the operation now. Try again later.
Articles 1–20