TOPSIS-AHP based approach for selection of reverse logistics service provider: a case study of mobile phone industry A Jayant, P Gupta, SK Garg, M Khan Procedia engineering 97, 2147-2156, 2014 | 167 | 2014 |
Optimizing OEE, productivity and production cost for improving sales volume in an automobile industry through TPM: a case study P Gupta, S Vardhan International journal of production research 54 (10), 2976-2988, 2016 | 163 | 2016 |
Effect of process parameters on kerf width in WEDM for HSLA using response surface methodology P Gupta, R Khanna, RD Gupta, N Sharma Journal of Engineering and Technology 2 (1), 1-6, 2012 | 56 | 2012 |
Addressing strategic human resource management practices for TQM: the case of an Indian tire manufacturing company P Verma, V Kumar, A Mittal, P Gupta, SC Hsu The TQM Journal 34 (1), 29-69, 2022 | 52 | 2022 |
Fractographic investigations of the failure of L-1 low pressure steam turbine blade LK Bhagi, P Gupta, V Rastogi Case Studies in Engineering Failure Analysis 1 (2), 72-78, 2013 | 49 | 2013 |
REVERSE LOGISTICS: PERSPECTIVES, EMPIRICAL STUDIES AND RESEARCH DIRECTIONS. A Jayant, P Gupta, SK Garg International Journal of Industrial Engineering 19 (10), 2012 | 42 | 2012 |
Study of success factors of TPM implementation in Indian industry towards operational excellence: An overview P Gupta, S Vardhan, MS Al Haque 2015 international conference on industrial engineering and operations …, 2015 | 36 | 2015 |
Reverse logistics network design for spent batteries: a simulation study A Jayant, P Gupta, SK Garg International Journal of Logistics Systems and Management 18 (3), 343-365, 2014 | 32 | 2014 |
A brief review on failure of turbine blades LK Bhagi, P Gupta, V Rastogi Proceedings STME-2013 Smart technologies for mechanical engineering, Delhi …, 2013 | 32 | 2013 |
Six sigma DMAIC Methodology Implementation in Automobile industry: A case study R Sharma, P Gupta, V Saini Journal of Manufacturing Engineering 13 (1), 042-050, 2018 | 18 | 2018 |
Mission reliability and availability prediction of flexible polymer powder production system P Gupta, J Singh, IP Singh Opsearch 42, 152-167, 2005 | 18 | 2005 |
Study of corrosive fatigue and life enhancement of low pressure steam turbine blade using friction dampers LK Bhagi, V Rastogi, P Gupta Journal of Mechanical Science and Technology 31, 17-27, 2017 | 16 | 2017 |
The impact of Quality Maintenance Pillar of TPM on manufacturing performance S Vardhan, P Gupta, V Gangwar 2015 International Conference on Industrial Engineering and Operations …, 2015 | 16 | 2015 |
An empirical study on enhancing product quality and customer satisfaction using quality assurance approach in an Indian manufacturing industry A Mittal, P Gupta International Journal of Mathematical, Engineering and Management Sciences 6 …, 2021 | 15 | 2021 |
Manufacturing Excellence through Total Productive Maintenance Implementation in an Indian Industry: A Case Study P Gupta, A Hooda International Journal of Mechanical and Production Engineering, Research and …, 2019 | 14 | 2019 |
Performance evaluation of a multi-state repairable production system: a case study AGP GUPTA International Journal of Performability Engineering 8 (3), 330, 2012 | 11 | 2012 |
A hybrid impedance control scheme for underwater welding robots with a passive foundation in the controller domain S Kumar, V Rastogi, P Gupta Simulation 93 (7), 619-630, 2017 | 10 | 2017 |
Exploring the challenges and techniques used for improving customer satisfaction through TQM: An empirical study P Gupta, A Mittal Journal of Advanced Manufacturing Systems 20 (03), 611-629, 2021 | 9 | 2021 |
Study on the implementation of Kobetsu Kaizen (KK) pillar of TPM in a process industry S Vardhan, P Gupta Applied Mechanics and Materials 592, 2694-2698, 2014 | 9 | 2014 |
Availability analysis of a part of rubber tube production system under preemptive resume priority repair A Goyal, SK Sharma, P Gupta International Journal of Industrial Engineering 16 (4), 260-269, 2009 | 9 | 2009 |