Follow
Maurizio Tomasella
Maurizio Tomasella
Chancellor's Fellow in Management Science at the University of Edinburgh Business School (UEBS)
Verified email at ed.ac.uk - Homepage
Title
Cited by
Cited by
Year
Impact of ramp-up on the optimal capacity-related reconfiguration policy
A Matta, M Tomasella, A Valente
International Journal of Flexible Manufacturing Systems 19, 173-194, 2007
612007
A risk based model for quantifying the impact of information quality
A Borek, AK Parlikad, P Woodall, M Tomasella
Computers in Industry 65 (2), 354-366, 2014
502014
Development of a conceptual reference framework to manage manufacturing knowledge related to products, processes and production systems
M Colledani, W Terkaj, T Tolio, M Tomasella
Methods and tools for effective knowledge life-cycle-management, 259-284, 2008
462008
Optimal reconfiguration policy to react to product changes
A Matta, M Tomasella, M Clerici, S Sacconi
International Journal of Production Research 46 (10), 2651-2673, 2008
352008
Development of the semantic object model for a PDKM System
J Cassina, M Tomasella, M Marquard, A Metin, A Matta, M Taisch
2006 IEEE International Technology Management Conference (ICE), 1-8, 2006
232006
The competitiveness of continuous monitoring of residential PV systems: A model and insights from the Japanese market
T Mukai, M Tomasella, AK Parlikad, N Abe, Y Ueda
IEEE Transactions on Sustainable Energy 5 (4), 1176-1183, 2014
212014
A review of sustainability in aviation: A multidimensional perspective
D Guimarans, P Arias, M Tomasella, CL Wu
Sustainable transportation and smart logistics, 91-121, 2019
182019
Vision and challenges for realizing the internet of things
O Vermesan, M Harrison, H Vogt, K Kalaboukas, M Tomasella, K Wouters, ...
CERP-‐IoT, Cluster of European Research Projects on the Internet of Things, 2010
182010
Constraint-based robust planning and scheduling of airport apron operations through simheuristics
YS Gök, S Padrón, M Tomasella, D Guimarans, C Ozturk
Annals of Operations Research 320 (2), 795-830, 2023
172023
A new closed-loop PLM Standard for mass products
J Cassina, M Tomasella, M Taisch, A Matta
International Journal of Product Development 8 (2), 141-161, 2009
172009
STTAR: a simheuristics-enabled scheme for multi-stakeholder coordination of aircraft turnaround operations
M Tomasella, A Clare, YS Gök, D Guimarans, C Ozturk
2019 Winter Simulation Conference (WSC), 488-499, 2019
162019
Collective mindfulness, resilience and team performance
N Oliver, M Senturk, TS Calvard, K Potocnik, M Tomasella
Academy of Management Proceedings 2017 (1), 12905, 2017
152017
A simheuristic approach for robust scheduling of airport turnaround teams
YS Gök, M Tomasella, D Guimarans, C Ozturk
2020 Winter Simulation Conference (WSC), 1336-1347, 2020
132020
Robust resource planning for aircraft ground operations
YS Gök, D Guimarans, PJ Stuckey, M Tomasella, C Ozturk
Integration of Constraint Programming, Artificial Intelligence, and …, 2020
112020
Closed-loop PLM of household appliances: an industrial approach
J Cassina, M Tomasella, A Matta, M Taisch, G Felicetti
Advances in Production Management Systems: International IFIP TC 5, WG 5.7 …, 2007
102007
Enhanced operational management of airport ground support equipment for better aircraft turnaround performance
S Saggar, M Tomasella, G Cattaneo, A Matta
2021 Winter Simulation Conference (WSC), 1-12, 2021
82021
On static vs dynamic (switching of) operational policies in aircraft turnaround team allocation and management
S Saha, M Tomasella, G Cattaneo, A Matta, S Padrón
2021 Winter Simulation Conference (WSC), 1-12, 2021
82021
The Dynamic bowser routing problem
R Rossi, M Tomasella, B Martin-Barragan, T Embley, C Walsh, ...
European Journal of Operational Research 275 (1), 108-126, 2019
82019
A detailed uml model for general flexible manufacturing systems
A Matta, TA Tolio, M Tomasella, P Zanchi
Proceedings of the CIRP International Seminar on Intelligent Computation in …, 2004
52004
Development of promise data structure
J Cassina, M Tomasella, M Taisch, M Marquard, A Metin, A Matta
Lean Business Systems and Beyond, 101-110, 2008
32008
The system can't perform the operation now. Try again later.
Articles 1–20