Follow
Walid Besbes
Walid Besbes
Taif University, College of Computers and Information Technology
Verified email at tu.edu.sa - Homepage
Title
Cited by
Cited by
Year
Scheduling hybrid flow shop problem with non-fixed availability constraints
W Besbes, J Teghem, T Loukil
European Journal of Industrial Engineering 4 (4), 413-433, 2010
392010
A review of recent advances in the operations research literature on the green routing problem and its variants
E Marrekchi, W Besbes, D Dhouib, E Demir
Annals of Operations Research 304, 529-574, 2021
192021
Using genetic algorithm in the multiprocessor flow shop to minimize the makespan
W Besbes, T Loukil, J Teghem
2006 International conference on service systems and service management 2 …, 2006
122006
A two-stage flow shop with parallel dedicated machines
W Besbes, T Loukil, J Teghem
8th International Conference of Modeling and Simulation, MOSIM 10, 2010
112010
Solving transport problems: towards green logistics
W Besbes, D Dhouib, N Wassan, E Marrekchi
John Wiley & Sons, 2019
72019
An overview of the recent solution approaches in the green vehicle routing problem
E Marrekchi, W Besbes, D Dhouib
Solving Transport Problems: Towards Green Logistics, 115-133, 2019
32019
A Genetic algorithm to minimize the makespan in the k-stage hybrid flow shop scheduling problem
W Besbes, J Teghem, T Loukil
Foundations of Computing and Decision Sciences 35 (1), 3-24, 2010
22010
Green Reverse Logistics: Case of the Vehicle Routing Problem with delivery and collection demands
N Wassan, N Wassan, L Simeonova, W Besbes
Solving Transport Problems: Towards Green Logistics, 161-183, 2019
12019
A new taxonomy for the Green Vehicle Routing Problem
E Marrekchi, W Besbes, D Dhouib
Proceedings of The 6th International Conference on Metaheuristics and Nature …, 2016
12016
Minimizing the maximum lead time in a 3-stage supply chain scheduling problem
W Besbes, J Teghem, T Loukil
META2016, 2016
12016
Un algorithme génétique pour minimiser le makespan dans un flow shop hybride avec périodes flexibles d’indisponibilité des machines
W Besbes, J Teghem, T Loukil
ROADEF 2009, 72, 2009
2009
Scheduling three-stage flow shop with parallel dedicated machines and transportation times
W Besbes, J Teghem, T Loukil
The system can't perform the operation now. Try again later.
Articles 1–12