Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem E Moradi, SMT Fatemi Ghomi, M Zandieh Expert Systems with Applications 38 (6), 7169-7178, 2011 | 204 | 2011 |
An efficient architecture for scheduling flexible job-shop with machine availability constraints E Moradi, SMT Fatemi Ghomi, M Zandieh The International Journal of Advanced Manufacturing Technology 51 (1), 325-339, 2010 | 45 | 2010 |
Single facility location problem E Moradi, M Bidkhori Facility location: Concepts, models, algorithms and case studies, 37-68, 2009 | 43 | 2009 |
Finding a maximum k-club using the k-clique formulation and canonical hypercube cuts E Moradi, B Balasundaram Optimization Letters 12 (8), 1947-1957, 2018 | 37 | 2018 |
Minimizing the makespan and the system unavailability in parallel machine scheduling problem: a similarity-based genetic algorithm E Moradi, M Zandieh The International Journal of Advanced Manufacturing Technology 51 (5), 829-840, 2010 | 32 | 2010 |
Correction to: Finding a maximum k-club using the k-clique formulation and canonical hypercube cuts Y Lu, E Moradi, B Balasundaram Optimization Letters 12, 1959-1969, 2018 | 13 | 2018 |
Competitive location problem MJ Karimifar, MK Sikarudi, E Moradi, M Bidkhori Facility location: Concepts, models, algorithms and case studies, 271-294, 2009 | 11 | 2009 |
Detecting large risk-averse 2-clubs in graphs with random edge failures F Mahdavi Pajouh, E Moradi, B Balasundaram Annals of Operations Research 249, 55-73, 2017 | 9 | 2017 |
Integrated Process Planning and Active Scheduling in a Supply Chain-A Learnable Architecture Approach E Moradi, A Ayough, M Zandieh Interdisciplinary Journal of Management Studies (Formerly known as Iranian …, 2019 | 1 | 2019 |
Quantitative Models in Supply Chain Management E Moradi, MRG Arsalan, AN Sadigh, HFR Ghalb Supply Chain Sustainability and Raw Material Management: Concepts and …, 2012 | 1 | 2012 |
Decomposition algorithms for detecting low-diameter clusters in graphs E Moradi Oklahoma State University, 2016 | | 2016 |
Scheduling integrated flexible job-shop problem with preventive maintenance to minimize makespan and system unavailability E Moradi, SMTF Ghomi International Journal of Management Perspective, 2013 | | 2013 |
Integrated Process Planning and Active Scheduling in a Supply Chain-A Learnable Architecture Approach M Zandieh, A Ayough, E Moradi | | |