Follow
rons arif
rons arif
PhD student
Verified email at student.qut.edu.au
Title
Cited by
Cited by
Year
A methodology for effective implementation of lean strategies and its performance evaluation in manufacturing organizations
A Karim, K Arif‐Uz‐Zaman
Business Process Management Journal 19 (1), 169-196, 2013
5932013
Lean supply chain performance measurement
K Arif-Uz-Zaman, AMM Nazmul Ahsan
International journal of productivity and performance management 63 (5), 588-612, 2014
2072014
Extracting failure time data from industrial maintenance records using text mining
K Arif-Uz-Zaman, ME Cholette, L Ma, A Karim
Advanced Engineering Informatics 33, 388-396, 2017
572017
Productivity improvement through line balancing in apparel industries
MRH Shumon, K Arif-Uz-Zaman, A Rahman, B Khulna
Proceedings of the 2010 International Conference on Industrial Engineering …, 2010
302010
Failure analysis of a mobile crane: a case study
MR Alam, SF Hassan, MA Amin, K Arif-Uz-Zaman, MA Karim
Journal of failure analysis and prevention 18, 545-553, 2018
152018
A fuzzy TOPSIS based multi criteria performance measurement model for lean supply chain
K Arif-Uz-Zaman
Queensland University of Technology, 2012
122012
Lean supply chain performance evaluation method
K Arif-Uz-Zaman, A Karim, P Hyland
Proceedings of the 10th ANZAM Operations, Supply Chain and Services …, 2012
112012
Prospects of Remanufacturing, Bangladesh perspective
RH Shumon, K Arif-Uz-Zaman
International Journal of Industrial Engineering: Theory, Applications and …, 2011
112011
Productivity improvement through balancing process using multi-skilled manpower in apparel industries
RH Shumon, K Arif-Uz-Zaman, A Rahman
International Journal of Industrial and Systems Engineering 1 11 (1-2), 31-47, 2012
62012
A data fusion approach of multiple maintenance data sources for real-world reliability modelling
K Arif-Uz-Zaman, ME Cholette, F Li, L Ma, A Karim
Proceedings of the 10th World Congress on Engineering Asset Management …, 2015
52015
Implementation of total quality management inBangladesh power generating sector: progress and problems
A Rahman, MK Uddin, K Arif-Uz-Zaman, MRH Shumon
International Journal of Industrial and Systems Engineering 1 11 (1-2), 122-136, 2012
42012
Triangular Linguistic Fuzzy based performance measurement model for supply chain to assess leanness attributes
K Arif-Uz-Zaman, A Karim
42011
An Optimal Joint Multi- Item Replenishment Policy for a Two-Level Supply Chain: Centralized Versus Decentralized Decision
AMMN Ahsan, K Arif-Uz-Zaman, MN Sultana
American Journal of Operational Research 3 (2), 45-50, 2013
32013
TQM for Bangladesh Power Generating Sector
A Rahman, MRH Shumon, K Arif-Uz-Zaman
32010
Failure and maintenance information extraction methodology using multiple databases from industry: A new data fusion approach
K Arif-Uz-Zaman
Queensland University of Technology, 2018
12018
Industrial Engineering Techniques and Applications
K Arif-Uz-Zaman, MRH Shumon, MH Hasan
International Conference on Mechanical, Industrial and Energy Engineering, 0
1
Fuzzy-TOPSIS Analysis for Standard Alternative Selection: A Multiple Attribute Decision-Making Method and Application for Small and Medium Manufacturing Enterprises (SMEs)
M Sakib, Shakil, K Arif-Uz-Zaman
Global Journal of Researches In Engineering 13 (5), 2014
2014
Opportunities and Implications of Six Sigma for Bangladeshi Industries: Case Study on a Cable Manufacturing Organization
AMMN Ahsan, MA Quddus, K Arif-Uz-Zaman
2012
Recent Trends and Issues of Sustainability in Battery Manufacturing Industries of Bangladesh
K Arif-Uz-Zaman, MA Habib, S Talapatra, M Lutfi, ME Kabir
Scheduler-Flexible scheduling method, Interface with planning and production
K Arif-Uz-Zaman, Md, H Shumon, A Rahman
The system can't perform the operation now. Try again later.
Articles 1–20